Rooftop Solar PV Protection

Rooftop PV protection keeps a solar array, its inverters and the building safe from direct strikes and surges. It combines air terminals that keep the array inside the protected volume, DC and AC surge protective devices, and bonding of the module frames and mounting structure.

Request a quote for this solutionSee the component BOQ

Air terminationDown conductorEarth termination
LPES solution codePVR
Governing standardIEC 62305-3 · IEC 61643-31
LPES design ruleFrame bonding 6 mm² or 16 mm²; DC SPDs at inverter and array

When it applies

  • Commercial and industrial rooftop PV plants
  • Buildings that already have a lightning protection system and are adding PV
  • Buildings without an LPS, where the array changes the lightning risk
  • String and central inverter systems up to 1,500 V DC

When it does not

  • Ground-mounted utility plants — see the ground-mounted PV, wind and BESS solution
  • Arrays whose DC voltage exceeds the continuous operating voltage of the selected SPD
  • Module-level electronics that the manufacturer protects internally — check before adding devices

How the system works

  1. AssessA lightning risk assessment and the sector's own standard set the protection level.
  2. Earth and bondEvery structure, frame and cabinet is joined to one earthing system.
  3. Protect the linesCoordinated surge protective devices are fitted on power, DC, RF and data lines.
  4. Monitor and maintainCounters and status contacts show what happened; inspection keeps the system in service.

Coordinated surge protection

Each device takes its share. The Class I device diverts lightning current at the service entry; Class II and III devices bring the remaining voltage below what the equipment can withstand.

Class IClass IIClass IIILPZ 0 → 1LPZ 1 → 2LPZ 2 → 3EquipmentSurge voltage falls at every zone boundary

Design parameters

The values a consultant or contractor needs to fix before the system is drawn.

ParameterTypical value or ruleReference
Risk and protection levelRisk assessment for the building with the array addedIEC 62305-2
Separation distanceArray kept at distance s from the LPS where possible; if not, frames are bonded to the LPSIEC 62305-3 Cl. 6.3
DC SPD typeType 2 when s is kept or there is no LPS; Type 1 or Type 1+2 when the array is bonded to the LPSIEC 61643-32
DC SPD voltageUcpv at least 1.2 × the array open-circuit voltage at standard test conditionsIEC 61643-32 · IEC 61643-31
SPD locationAt the inverter DC input; a second set at the array when the DC cable exceeds 10 mIEC 61643-32
AC sideType 2, or Type 1+2 with an LPS, at the inverter AC output and at the main boardIEC 61643-11 · IEC 60364-7-712
Bonding conductor6 mm² copper minimum; 16 mm² copper where it may carry lightning currentIEC 60364-7-712 · IEC 62305-3

Solution pack: component BOQ

Each line opens the LPES product category. Part codes and final quantities are confirmed on your quote from the drawings.

ComponentRole in the systemQuantity rule
DC & PV SPDsDC surge protection at the inverter and arrayOne set per MPPT input, plus one at the array end where the cable is longer than 10 m
PV String Combiner BoxesString combiner boxes with fuses, isolator and DC SPDOne per group of strings from the single-line diagram
Inverter AC Distribution BoxesAC distribution box with breaker and AC SPDOne per inverter or inverter group
Earthing KitsElectrodes and conductors for the array earth, bonded to the building earthFrom the earthing design; typically two electrodes per array block
Air Terminal RodsKeep the array inside the protected volumeFrom the rolling-sphere layout around the array

From design to handover

  1. Assess the lightning risk for the building with the array
  2. Lay out air terminals and check separation distance to the frames
  3. Select DC and AC SPDs from system voltage, LPS status and cable lengths
  4. Bond frames and structure and connect to the building earthing
  5. Test earth resistance and SPD installation, and record in the plant file

What the standards require

Checked against the current editions held in the LPES standards library.

IEC 62305-2:2024
Risk to life and physical damage is compared with a tolerable risk of 10⁻⁵ per year; failure of internal systems is judged separately as a frequency.
IEC 62305-4:2024
A coordinated SPD system protects against conducted surges only. Radiated fields need shielding and cable routing.
IEC 62305-4:2024 Cl. 7
Where an external LPS exists, a Class I (Type 1) SPD is required at the service entry.
IEC 62305-4:2024
Earthing conductor to the SPD: 16 mm² copper for Class I, 6 mm² for Class II and 1.5 mm² for Class III.
CEA Safety Regulations 2023, Reg. 38(3)
Lightning protection is addressed for multi-storeyed buildings above 15 m and listed public premises such as airports, hospitals and hotels.
IEEE 80-2013
A substation grid is judged by touch and step voltage against the tolerable limits, not by its resistance alone.

Regulation and standards cross-check

What Indian regulation and the wider standards add to this solution. Paraphrased; confirm against the current official text, amendments and state notifications before relying on a clause in a tender or inspection.

StandardClauseWhat it requires
CEA Safety Regulations 2023Reg 121Solar plants need lightning and overvoltage protection with lightning arresters, a surge protective device with arc-extinguishing capability in every combiner box, earth-fault protection with insulation monitoring, and earthing of all array structures, frames and enclosures with welded strip connections.
IS 3043:2026Clause 11.3On solar plants the a.c. side is TN or TT and never TN-C. A separate protective conductor is always required, frame bonds are at least 6 mm² copper, and separate electrodes for the d.c. side, a.c. side, inverter or lightning protection are non-compliant.
CEA Safety Regulations 2023Reg 38(3)(vi)Lightning protection is required for multi-storeyed buildings above 15 m and for listed premises, which include hospitals, hotels, academic buildings, industrial installations and other public buildings. The regulation names no design standard, so IS/IEC 62305 applies through Reg 14.
IS 732:2019Clause 1, 4.5.3, 5.3.5The wiring code covers installations up to 1,000 V a.c. or 1,500 V d.c. Its surge clauses govern whether a surge protective device is needed and how it is selected, connected and coordinated.
IEC 60364-6:20166.4.3.3Surge protective devices are disconnected for the insulation resistance test. Where that is impracticable the test voltage may be reduced to 250 V d.c., and the result must still be at least 1 MΩ.
CEA Safety Regulations 2023Reg 43(v)Every building shall have protective equipotential bonding that interconnects exposed and extraneous conductive parts.

What we ask for before design starts

  • Single-line diagram with sources, operating modes and earthing arrangement
  • Equipment list with impulse withstand levels
  • Cable routes and every point where services enter
  • Fault levels and protection clearing times
  • Existing earthing and lightning protection records
  • Site layout with fences, pipes, rails and neighbouring installations

Engineering depth: from the LPES Knowledge Hub

Topic studies written against the current standards. Open each part for the method, the mistakes to avoid and the checklist.

IEC 62305-4:2024 · LPES Knowledge Hub H-62

Roof-mounted PV systems current sharing with a non-isolated LPS and the simplified formula

When a rooftop PV array sits inside a structure's external lightning protection system (LPS) and the separation distance s to the down conductors cannot be maintained, part of the lightning current no longer stays on the LPS: it finds a second, ohmic path through the DC power cabling of the PV system, via the surge protective devices (SPDs) that bond the array frame and the DC conductors to the LPS. Annex F of IEC 62305-4:2024 gives a simplified way to estimate how much of the total lightning current — sized to the lightning protection level (LPL) — ends up flowing through each DC power conductor, so that the DC-side SPDs can be selected with a current rating that actually matches what they will be asked to carry. The governing simplified relationship is IDC = ILPL × kc / (2 × n′), where kc is the same down-conductor sharing coefficient used for the external LPS (IEC 62305-3:2024, 6.3.2, Table 13) and n′ is the number of DC power conductors and bonding conductors sharing the current at that point.

How it is applied
  1. confirm the trigger condition: is the PV array's DC wiring, or its mounting frame, bonded to the structure's external LPS because the separation distance s cannot be maintained? If yes, this topic's method applies; if the separation distance is maintained, use the simpler In = 5 kA, 8/20, Class II rule from F.2.1 instead.
  2. establish ILPL: read the LPL from the structure's IEC 62305-2 risk assessment, and take ILPL as 200 kA (LPL I or unknown), 150 kA (LPL II), or 100 kA (LPL III or IV).
  3. establish kc: count the number of external down conductors on the LPS design (IEC 62305-3:2024) and read kc from Table 13 there (1 / 0,66 / 0,44 for one / two / three-or-more down conductors).
  4. establish n′: count the DC power conductors plus bonding conductors that share the bonding point being assessed (a simple two-wire DC circuit with one separate bonding conductor gives n′ = 3, as in the worked example).
  5. either calculate IDC directly with Equation (F.1), or read the equivalent pre-calculated per-pole and total values straight from Table F.1 (voltage-limiting/combination SPD) or Table F.2 (voltage-switching SPD), matching the LPL row and the "<4" or "≥4" down-conductor column.
  6. select the DC-side SPD: it must be Test Class I (able to carry the 10/350 µs partial lightning current) whenever separation is not maintained, with a rated Iimp (or In, depending on SPD type) equal to or greater than the calculated/tabulated value.
  7. where the design uses several string inverters (a larger plant), apply the Table F.1 values to the Class I SPDs on the AC side of the string inverters and at the low-voltage side of the central transformer; Class II SPDs are normally acceptable on the short DC run between a PV string and its own string inverter, provided that run has only one set of SPDs.
  8. if separation is not maintained, also specify shielded DC cable or a metallic duct/conduit for the DC wiring, bond the shield at both ends to the local bonding bars, and design the shield itself to carry partial lightning current as if it were a down conductor.
  9. where a less conservative, more precise figure is needed (e.g. because the simplified method's known over-estimation, per NOTE 2, is driving an uneconomical SPD choice), use the detailed calculation route of IEC 61643-32:2017, Clause A.2, instead of the Annex F simplification.
Common mistakes
  • Specifying an SPD by its AC surge rating alone and assuming it is automatically adequate for the DC side — F.1 states explicitly that SPDs between the array and the inverter must be rated for the DC rating of the array; DC-side surge duty is a separate design question from AC-side duty.
  • Treating the "separation distance maintained" case (Class II, In = 5 kA, 8/20, per F.2.1) and the "separation not maintained" case (Class I, Annex F.2.2 method) as interchangeable, or defaulting to the lighter Class II rating without first confirming which geometry actually exists on site.
  • Reading kc from memory or from a generic default instead of counting the actual number of down conductors on the specific structure's LPS design and pulling the correct value from IEC 62305-3:2024, Table 12.
  • Forgetting that Table F.1 and Table F.2 already assume a specific SPD topology (voltage-limiting/combination for F.1, voltage-switching for F.2) — mixing a Table F.1 current rating onto a switching-type SPD, or vice versa, does not carry the same safety margin.
  • Treating the shielding recommendation in F.1 (shielded cable or metallic conduit, bonded at both ends, when separation is not maintained) as optional good practice rather than as an integral part of the current-sharing protection concept — an unshielded, unbonded DC run in a non-isolated installation loses the induction-reduction benefit the annex assumes.
  • Using the Annex F simplified figures as if they were a precise prediction rather than the deliberately conservative overestimate NOTE 2 describes, then being surprised when a more detailed IEC 61643-32:2017 calculation gives a lower, more economical figure.
  • On multi-string plants, applying the short-DC-run Class II allowance (string to its own string inverter, single SPD set) to a DC run that is not actually short, or that carries more than one set of SPDs — the annex's relaxation for that case is conditional, not a blanket rule for all DC-side SPDs in a multi-inverter plant.
Design checklist
  • Confirmed whether the PV installation's separation distance s to the LPS is maintained or not, and documented which branch (F.2.1 Class II, or F.2.2 Annex F non-isolated method) applies.
  • Recorded the design LPL and the corresponding ILPL (200/150/100 kA).
  • Counted the external down conductors and recorded the applicable kc (1 / 0,66 / 0,44) from IEC 62305-3:2024, Table 12.
  • Counted n′ (DC power conductors + bonding conductors) at the bonding point being assessed.
  • Calculated IDC via Equation (F.1), or confirmed the applicable Table F.1/F.2 row and column, and recorded which of the two (voltage-limiting vs voltage-switching SPD) topology the selected SPD uses.
  • Verified the selected DC-side SPD is Test Class I, with Iimp (or In) at or above the calculated/tabulated value.
  • For a non-isolated installation, specified shielded DC cable or metallic conduit, bonded at both ends to the local bonding bars, and confirmed the shield is sized to carry partial lightning current.
  • For multi-string plants, confirmed which SPDs sit on the (Table F.1-rated) AC/transformer side versus the (potentially Class II) short DC string-to-inverter run, and that the "single SPD set, short run" condition for the Class II relaxation is actually met.
  • Where the simplified figures appear to force an uneconomical or oversized SPD, considered the detailed alternative calculation of IEC 61643-32:2017, Clause A.2.

Try the numbers

Protection level explorer

Rolling-sphere radius
45 m
Mesh size
15 × 15 m
Down-conductor spacing
15 m
Peak current covered
100 kA
Coefficient ki
0.04
Interception efficiency
90%

Values from IEC 62305-1 and IEC 62305-3. The level for your structure comes from the risk assessment.

What we find on audits

  • Equipment earths and lightning earths kept separate
  • Surge protective devices chosen without coordination or the right voltage rating
  • Long connecting leads that add kilovolts to the protection level
  • Data and signal lines left unprotected while power lines are protected
  • No inspection after a strike, so failed devices stay in service

What you receive: the LPES Protection Passport

  • As-built drawings of the installed system
  • Risk assessment and design calculations
  • Test results: earth resistance, continuity, SPD checks
  • Component list with part codes and type-test references
  • Inspection schedule for the protection level

Lightning to Load: one accountable partner

  1. Assess
  2. Design
  3. Specify
  4. Supply
  5. Implement
  6. Verify
  7. Assure

Standards basis

IEC 62305-2, -3 and -4:2024 (Ed. 3) · IEC 61643 series · IEEE 80-2013 · IEC 61936-1:2021 · IS 3043:2026 · CEA Safety Regulations 2023 · IS 732:2019 · IEC 60364-6:2016 · IEC 61936-1:2021

Reviewed by LPES engineering, November 2026. Clause and table numbers follow IEC 62305:2024 (Edition 3) and IS 3043:2026.

Questions engineers ask

Does rooftop solar need lightning protection?

The array does not attract lightning, but it adds exposed equipment. A risk assessment decides whether an LPS is needed; surge protection is recommended in all cases. Lightning Risk Assessment

Type 1 or Type 2 SPD on the DC side?

Type 2 when the array is kept at the separation distance from the LPS or there is no LPS. Type 1 or 1+2 when the frames are bonded to the LPS. DC & PV SPDs

Where should DC SPDs be installed?

At the inverter DC input, and also at the array when the DC cable between them is longer than 10 m. PV String Combiner Boxes

Should module frames be earthed?

Yes. Frames and mounting structure are bonded together and connected to the building earthing. Earthing Kits

Who coordinates the DC and AC protection?

An SPD coordination design sets the type, rating and location of every device from array to main board. SPD Coordination Design

Get this solution quoted for your site

Send the drawings or the basic dimensions. LPES returns the design parameters, the BOQ with part codes and the price in one offer.

Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.