Lightning, earthing and surge protection for solar, wind and hybrid plants
Renewable plants are spread over open land with nothing taller than their own equipment. Every string, inverter, turbine and container is exposed, and every cable between them picks up surge energy. LPES designs the earth grid, the air termination and the DC, AC and data SPDs as one plant-wide system.

Renewable Energy
Wind turbines
- Threat
- Direct strikes to blades, and current passing through nacelle and tower.
- LPES measure
- Lightning current is carried from blade receptors through the tower to a foundation earth electrode, with a ring electrode around the base. Turbines are interconnected by bare conductor in the cable trench. SPDs protect the tower base and nacelle panels.
- Families
Lightning, earthing and surge risks on renewable energy sites
Inverter and string failures
Long DC cable loops act as antennas. Induced surges take out bypass diodes, string monitoring and inverter inputs, often with no visible strike.
Turbine blade and nacelle damage
Turbines are struck regularly. If the path from receptor to foundation is not continuous, the current passes through bearings and control systems.
Battery containers
A BESS container packs power electronics, communication and stored energy into one steel box. Surge damage to the BMS has a high consequence.
SCADA and tracker outages
Weather stations, tracker controllers and string monitoring talk over RS-485 and Ethernet across the field. One event can leave the plant running blind.
One coordinated lightning protection, earthing and surge protection system
Four pillars. Connected protection. Clear accountability.
Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

Lightning protection
A risk assessment decides where air termination pays for itself. Inverter stations, control rooms, BESS and met masts are usually protected. Arrays get rods where the risk and plant value justify them, placed so they do not shade the modules.

Power protection
Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

Earthing protection
One interconnected grid ties array tables, inverter stations, turbines, BESS and the pooling substation together. The switchyard grid is designed for step and touch voltage. The field earthing is designed for corrosion life and for small loop area next to the DC cables.

Surge protection
DC SPDs at combiners and inverter inputs, AC SPDs at inverter output and auxiliary boards, and data-line SPDs on every monitoring and tracker loop. LPES also supplies them pre-assembled as string combiner and AC distribution boxes.
Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.
Earthing and PE conductors: what protects people, and what CEA 2023 requires
An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.
On your renewable energy site
Module structures, combiner boxes, inverters and containers are joined in one continuous run, with strips welded and not bolted. A flexible braided copper link connects each inverter cabinet frame to the earthing busbar. Insulated copper PE goes with every AC feeder.
- Reg 121(2)All non-current-carrying metal is earthed in one long run, with strips interconnected by welding, not bolting.
- Reg 121(2)The inverter cabinet frame is connected to the earthing busbar with flexible braided copper wire.
- Reg 121(3)(ii)Every combiner box has a suitable SPD.
- Reg 121(3)(i)The plant has lightning and overvoltage protection with the required number of lightning arresters.
Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.
Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.
LPS class, SPD rating and conductor sizes for renewable energy projects
The figures engineers look up most, with the clause behind each. Rows marked in red are specific to renewable energy sites.
| Item | Value | Source |
|---|---|---|
| PV DC SPD, separation distance kept | Type 2, In 5 kA (8/20) at LPL III | IEC 62305-4:2024, Annex F |
| PV DC SPD, array bonded to the LPS | Type 1 DC SPD and a bond to the LPS | IEC 62305-4:2024, Annex F |
| Module frame bonds | At least 6 mm² copper, outdoor rated | IS 3043:2026, 11.3 |
| Combiner boxes | An SPD in every combiner box | CEA 2023, Reg 121(3)(ii) |
| Rolling sphere radius | 20 / 30 / 45 / 60 m for LPS Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Air-termination mesh | 5 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Down-conductor spacing | 10 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 5 |
| LPS conductor, minimum | 50 mm² in copper, aluminium, galvanised or stainless steel | IEC 62305-3:2024, Table 7 |
| Lightning earth | Ring electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 Ω | IEC 62305-3:2024, 5.4 |
| Entrance SPD where an LPS exists | Type 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IV | IEC 62305-4:2024, Table C.3 |
| SPD connecting leads | 0.5 m total or less, line to SPD to earth bar | IEC 62305-4:2024, Annex C |
| Second SPD | Needed when equipment is more than 10 m from the entrance SPD | IEC 62305-4:2024, Annex C |
| Bonding bar to earth | 16 mm² copper, 25 mm² aluminium or 50 mm² steel | IEC 62305-3:2024, Table 9 |
| Disconnection time, TN final circuits | 0.4 s at 230 V, 0.2 s above 230 V | IS 3043:2026, Table 1 |
| Loop impedance, measured | Zs ≤ ⅔ × U0 / Ia | IS 3043:2026 and IS 732 |
| PE and bonding continuity | Within the conductor’s own resistance, tested at about 10 A | IS 3043:2026, Annex E |
The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.
Every part of the renewable energy protection system has its own test standard
IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.
| Component | What the standard proves | Standard |
|---|---|---|
| Clamps, connectors and bonding parts | Each joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA. | IEC 62561-1 |
| Conductors and earth electrodes | Sets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper. | IEC 62561-2 |
| Isolating spark gaps | Joins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike. | IEC 62561-3 |
| Conductor holders and fixings | Holders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures. | IEC 62561-4 |
| Earth pit housings and electrode seals | Inspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab. | IEC 62561-5 |
| Lightning strike counters | The counter records each strike carried by a down conductor. A new count is the trigger for an inspection. | IEC 62561-6 |
| Earth enhancing compounds | The compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it. | IEC 62561-7 |
| Surge protective devices | Part 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants. | IEC 61643-11, IEC 61643-21, IEC 61643-31 |
| PE, bonding and earthing conductors | Sets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame. | IEC 60364-5-54, IS 3043:2026, IS 732:2019 |
LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.
What goes into your renewable energy project
Each card opens the product family in the LPES catalogue.









Areas LPES covers in renewable energy
- Utility-scale solar PV plants
- Rooftop and C&I solar
- Wind farms
- Hybrid and round-the-clock projects
- Battery energy storage systems
- Pooling substations and switchyards
- Green hydrogen electrolyser plants
- SCADA, PPC and weather stations
Is your renewable energy site ready for an inspection?
Six points an Electrical Inspector or an insurer will ask about.
- Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
- Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
- Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
- Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
- The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
- SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Answer the six points for your site. Nothing is sent anywhere until you ask.
What each person on a renewable energy project asks
When did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?
LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.
Testing & MeasurementLightning to Load
Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.
Calculated. Coordinated. Implemented. Verified.
- AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
- DesignLPS, earthing and SPD design with calculations and drawings
- SpecifyBill of materials with LPES part numbers and data sheets
- SupplyProducts from one source, tested to IEC 62561 and IEC 61643
- ImplementInstallation supervision or turnkey execution
- VerifyContinuity, earth resistance and SPD checks, recorded
- AssurePeriodic inspection, monitoring and AMC
LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.
LPES servicesBuilt and comply to
- CEA Safety Regulations 2023
- IEC 62305-1 to -4
- IEC 61643-31 and -32
- IEC 60364-7-712
- IEC 61400-24
- IEEE 80
- IEEE 2778
- IS 3043:2026
- CEA Regulations 2023
The applicable edition and any project or statutory specification are confirmed at the design stage.
Renewable Energy lightning protection and earthing: frequently asked questions
Type 1 or Type 2 SPD on the DC side of a PV plant?
Related: DC & PV SPDs ›
Does a solar farm need air terminals?
Related: Air Termination ›
How should wind turbine earthing be arranged?
Related: Foundation Earthing ›
Engineering guides from the LPES knowledge hub
- Corrosion of earthing conductors and electrodesHB-ID-541
- Surge protection measures (SPM)HB-ID-390
- Types of protective earthing conductors and their electrical continuityHB-ID-530
- Earthing conductor and protective bonding conductor sizingHB-ID-528
- Main earthing terminal / main earth busbar (MET)HB-ID-529
- Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
- Measurement of earth fault loop impedance
- Continuity resistance measurement
Related industries
- Power IndustryIndustry page
- Substations & T&DIndustry page
- EV InfrastructureIndustry page
- Oil, Gas & HazardousIndustry page
More in Energy & Power
- Energy & PowerSector overview
- Power IndustryIndustry page
- Substations & T&DIndustry page
- EV InfrastructureIndustry page
- All industriesIndustries overview
Your power is connected. Is your protection?
Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.
Talk to LPES about a coordinated assessment for your renewable energy project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.

