Lightning, earthing and surge protection for steel and metals plants
A steel plant moves hot metal through continuous lines. When a drive, a PLC or a furnace control trips, steel stops in the stands and everything behind it backs up. LPES protects the tall structures, the plant earthing and the drives and automation as one coordinated system, from the grid intake to the last instrument.

Steel & Metals
Blast furnace, stoves and stacks
- Threat
- Direct strikes to the furnace top, hot blast stoves and stacks, with side flashes on structures above 60 m.
- LPES measure
- Furnace shell and structural steel are used as natural air termination and down conductors where thickness and continuity are verified. Air terminals protect top-mounted instruments, and every structure is tied to the ring electrode.
- Families
Lightning, earthing and surge risks on steel plant sites
A mill stopped with hot steel in it
A surge that trips a main drive, a hydraulic control or a mill PLC stops the strip between the stands. Clearing a cobble costs hours of production and puts people next to hot metal.
The tallest steel in the district
Blast furnace tops, hot blast stoves, stacks, gas holders and conveyor galleries stand well above everything around them and take the strikes for the whole plant.
Fuel gas across the site
Blast furnace gas and coke oven gas are cleaned, stored and piped over long distances. A spark across an unbonded flange or holder seal during a strike is an ignition source.
High fault levels and large drives
Arc furnaces, furnace transformers and multi-megawatt drives sit on very high fault levels. Touch and step voltage in substations and around furnace bays has to be designed and tested.
One coordinated lightning protection, earthing and surge protection system
Four pillars. Connected protection. Clear accountability.
Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

Lightning protection
Furnaces, stoves, stacks, gas holders, melt shops and mill bays are assessed together. Structural steel is used as a natural component where its thickness and continuity are proven by measurement, and added air terminals protect the instruments, lights and cameras mounted above it.

Power protection
Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

Earthing protection
Each shop has its own grid and all grids are interconnected, so the furnace, the mill, the substations and the control rooms sit on one earthing system. Motors and transformers get duplicate earth connections, crane rails and gas mains are bonded, and substations are designed on touch and step voltage.

Surge protection
Protection follows the power and automation hierarchy. Type 1+2 at each substation LT board, Type 2 at drive and MCC panels, Type 3 and signal SPDs at PLCs, pulpits and field instruments. Status contacts report to the control system, so a spent module is replaced before the next storm.
Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.
Earthing and PE conductors: what protects people, and what CEA 2023 requires
An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.
On your steel plant site
MV and LV motors, converter panels and transformers each get two earth connections. Galvanised or copper-bonded strip bonds building steel, crane rails and conveyor galleries. Copper is used for drive and control earthing, and flexible braids bridge mill bases and other vibrating equipment.
- Reg 43(vii)Frames of motors and control apparatus above 250 V are earthed by two separate and distinct connections.
- Reg 50(2)Generator and transformer neutrals above 650 V are earthed by not less than two separate connections.
- Reg 50(1)Substation earthing limits touch potential, step potential and earth potential rise.
- Reg 50(8)Earth resistance is tested on a dry day at least once a year and the record is kept.
Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.
Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.
LPS class, SPD rating and conductor sizes for steel plant projects
The figures engineers look up most, with the clause behind each. Rows marked in red are specific to steel plant sites.
| Item | Value | Source |
|---|---|---|
| Structures above 60 m | Protect the top 20 % of the height against side flashes | IEC 62305-3:2024, 5.2.3 |
| Steel frame or rebar as down conductor | Overall continuity 0.2 Ω or less, measured four-wire at about 10 A | IEC 62305-3:2024, D.5.3.5 |
| Drives with high PE current (over 10 mA) | PE of at least 10 mm² copper, or a second PE | IS 3043:2026, 7.6 |
| Substation earth grid | Designed on touch and step voltage, not on a resistance figure | IS 3043:2026, cl. 10 · IEEE 80 |
| Rolling sphere radius | 20 / 30 / 45 / 60 m for LPS Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Air-termination mesh | 5 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Down-conductor spacing | 10 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 5 |
| LPS conductor, minimum | 50 mm² in copper, aluminium, galvanised or stainless steel | IEC 62305-3:2024, Table 7 |
| Lightning earth | Ring electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 Ω | IEC 62305-3:2024, 5.4 |
| Entrance SPD where an LPS exists | Type 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IV | IEC 62305-4:2024, Table C.3 |
| SPD connecting leads | 0.5 m total or less, line to SPD to earth bar | IEC 62305-4:2024, Annex C |
| Second SPD | Needed when equipment is more than 10 m from the entrance SPD | IEC 62305-4:2024, Annex C |
| Bonding bar to earth | 16 mm² copper, 25 mm² aluminium or 50 mm² steel | IEC 62305-3:2024, Table 9 |
| Disconnection time, TN final circuits | 0.4 s at 230 V, 0.2 s above 230 V | IS 3043:2026, Table 1 |
| Loop impedance, measured | Zs ≤ ⅔ × U0 / Ia | IS 3043:2026 and IS 732 |
| PE and bonding continuity | Within the conductor’s own resistance, tested at about 10 A | IS 3043:2026, Annex E |
The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.
Every part of the steel plant protection system has its own test standard
IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.
| Component | What the standard proves | Standard |
|---|---|---|
| Clamps, connectors and bonding parts | Each joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA. | IEC 62561-1 |
| Conductors and earth electrodes | Sets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper. | IEC 62561-2 |
| Isolating spark gaps | Joins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike. | IEC 62561-3 |
| Conductor holders and fixings | Holders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures. | IEC 62561-4 |
| Earth pit housings and electrode seals | Inspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab. | IEC 62561-5 |
| Lightning strike counters | The counter records each strike carried by a down conductor. A new count is the trigger for an inspection. | IEC 62561-6 |
| Earth enhancing compounds | The compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it. | IEC 62561-7 |
| Surge protective devices | Part 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants. | IEC 61643-11, IEC 61643-21, IEC 61643-31 |
| PE, bonding and earthing conductors | Sets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame. | IEC 60364-5-54, IS 3043:2026, IS 732:2019 |
LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.
What goes into your steel plant project
Each card opens the product family in the LPES catalogue.









Areas LPES covers in steel & metals
- Blast furnaces, stoves and gas cleaning plant
- Sinter, pellet and coke oven plants
- Melt shops: BOF, EAF and induction furnaces
- Ladle furnaces and continuous casters
- Hot and cold rolling mills and finishing lines
- Raw material yards, conveyors and stock houses
- Main receiving and shop substations
- PLC, DCS, SCADA and plant networks
Is your steel plant site ready for an inspection?
Six points an Electrical Inspector or an insurer will ask about.
- Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
- Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
- Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
- Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
- The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
- SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Answer the six points for your site. Nothing is sent anywhere until you ask.
What each person on a steel plant project asks
When did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?
LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.
Testing & MeasurementLightning to Load
Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.
Calculated. Coordinated. Implemented. Verified.
- AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
- DesignLPS, earthing and SPD design with calculations and drawings
- SpecifyBill of materials with LPES part numbers and data sheets
- SupplyProducts from one source, tested to IEC 62561 and IEC 61643
- ImplementInstallation supervision or turnkey execution
- VerifyContinuity, earth resistance and SPD checks, recorded
- AssurePeriodic inspection, monitoring and AMC
LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.
LPES servicesBuilt and comply to
- CEA Safety Regulations 2023
- IEC 62305-1 to -4
- IEC 62561 series
- IEC 61643-11 and -21
- IEC 60364-5-53
- IEC 61936-1
- IEEE 80
- IS 3043:2026
- CEA Safety Regulations 2023
The applicable edition and any project or statutory specification are confirmed at the design stage.
Steel & Metals lightning protection and earthing: frequently asked questions
The plant is built of steel. Does it still need a lightning protection system?
Related: Air Termination ›
Our drives have built-in protection. Why add SPDs?
Related: Type 2 SPDs ›
Should each shop have its own earth pits?
Related: Earth Mats & Grids ›
How is earthing designed around arc furnaces and large substations?
Related: Design & Engineering ›
Engineering guides from the LPES knowledge hub
- Design of a substation earthing system, step by stepHB-ID-373
- Earthing of installations with higher protective conductor currentHB-ID-536
- Types of protective earthing conductors and their electrical continuityHB-ID-530
- Earthing conductor and protective bonding conductor sizingHB-ID-528
- Main earthing terminal / main earth busbar (MET)HB-ID-529
- Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
- Measurement of earth fault loop impedance
- Continuity resistance measurement
Related industries
- CementIndustry page
- MiningIndustry page
- Power IndustryIndustry page
- Automobile IndustryIndustry page
More in Manufacturing & Process
- Manufacturing & ProcessSector overview
- Automobile IndustryIndustry page
- CementIndustry page
- Chemicals & FertilisersIndustry page
- Electronics & EMSIndustry page
- FMCG & BeveragesIndustry page
- Paints & CoatingsIndustry page
- Plastics & PolymersIndustry page
- Textiles & GarmentsIndustry page
- All industriesIndustries overview
Your power is connected. Is your protection?
Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.
Talk to LPES about a coordinated assessment for your steel plant project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.