LPES International
LPES International
Protection to Perfection
Currency
0
0
Company Standards Updates
Home  /  Resources  /  Standards Updates
Standards and Regulation Updates

What changed in the standards, and what it means for your site.

Dated changes to the regulations and standards that govern lightning protection, earthing and surge protection, each with the practical consequence for an existing installation. No press releases.

Indian Standard

IS 3043:2026 published: Earthing, Code of Practice (third revision)

The earthing code has been rewritten and aligned with the CEA Regulations 2023, the National Electrical Code 2023, IS 732:2019 and IS/IEC 61936-1. It supersedes IS 3043:2018.

What changed

  • Separate “dedicated” or “clean” earth electrodes are listed as practices that shall not be followed. One interconnected, meshed network is required.
  • For low-voltage installations there is no minimum electrode resistance. Protection is proven by loop impedance and disconnection time.
  • Earth enhancing compounds are limited to soil above 3000 Ω·m and to lightning protection use, and barred below 200 Ω·m.
  • New bonding resistance limits for substations: 0.1 mΩ per joint, 2.5 mΩ between parts within reach, 10 mΩ between any two items.
  • New sections on foundation electrodes, global earthing systems, GIS, medical locations, solar PV and data centres.

What it means for your site

Sites built around separate pits for neutral, body, UPS and instrumentation no longer match the code. Review the earthing layout, interconnect the electrodes and add loop impedance and continuity tests to the periodic test plan.

International Standard

IEC 62305:2024 (Edition 3) published: Protection against lightning

The third edition of the lightning protection standard replaces the 2010 edition across risk management, the external system and protection of electrical and electronic systems.

What changed

  • Risk assessment now has two criteria: risk R for loss of life and physical damage, and a separate frequency of damage F for internal systems.
  • Lightning density is entered as ground strike-point density, not flash density.
  • A new table sets sheet and pipe thickness where hot spots matter, important for tanks and process vessels.
  • The separation distance calculation is clarified, with a general and a simplified approach.
  • New guidance for green roofs and for protruding parts on the facades of tall buildings. “Electrically insulated LPS” is defined as its own system type.

What it means for your site

Risk assessments made to the 2010 edition may give a different class under the 2024 method, especially for sites with sensitive electronics. Re-run the assessment before a major extension or refurbishment.

Regulation

CEA (Measures relating to Safety and Electric Supply) Regulations 2023 notified

Notified on 8 June 2023, replacing the 2010 regulations. They set the legal requirements for earthing, bonding, lightning protection and surge protection of electrical installations in India.

What changed

  • Lightning protection to the relevant standards for multi-storeyed buildings above 15 m and for listed public and industrial premises (Regulation 38).
  • Protective equipotential bonding in every building, and loop impedance testing so that protective devices operate in time (Regulation 43).
  • Every generator and transformer neutral earthed by two separate and distinct connections (Regulation 43).
  • Solar PV plants: lightning and overvoltage protection, and an SPD in every combiner box (Regulation 121).
  • EV charging stations: a lightning protection system and earth continuity monitoring (Regulations 124 and 125).

What it means for your site

Inspection forms now ask for evidence: bonding tested, loop impedance tested for each circuit and for every source, and earth resistance records. Sites should hold these records before an inspection, not after.

Code

National Electrical Code of India 2023 (SP 30:2023)

The National Electrical Code is named in Regulation 14 of the CEA Regulations as a document that shall be followed, alongside the National Building Code.

What changed

  • Earthing arrangements, electrode types and protective conductor sizing are aligned with IS 732 and now with IS 3043:2026.
  • Construction sites and street lighting earthing are covered in the Code, and IS 3043:2026 refers to it for both.

What it means for your site

Where a specification cites the Code, read it together with IS 3043:2026 and IS 732:2019. The three now agree on the principles.

Not sure whether a change affects you?

Ask for a gap review against the current editions.

We compare your earthing and lightning protection records with the current regulation and standards and list what to update, in priority order.

Summaries are for guidance and are written from the published documents. Check the official text and any later amendment before relying on a clause.

Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.