The standards behind every LPES design, and what each one asks of your site.
Lightning protection, earthing and surge protection are governed by a stack of regulations and standards that refer to one another. This page sets out which document governs what, the values engineers use most, and the LPES solution and product family each one leads to.
Which document wins when two disagree.
In India the hierarchy is set by the CEA Regulations themselves. An LPES design basis always states it in this order.
| Level | Authority | Documents | How it applies |
|---|---|---|---|
| 1 | Law | Electricity Act 2003 and the CEA (Measures relating to Safety and Electric Supply) Regulations 2023 | Mandatory. Where a regulation and a standard differ, the regulation prevails (Regulation 14). |
| 2 | Indian Standards and codes | IS 3043:2026, IS 732:2019, IS/IEC 62305, IS/IEC 61936-1, National Electrical Code (SP 30:2023), National Building Code | Made binding through Regulation 14, which requires the relevant standards to be followed. |
| 3 | International standards | IEC 62305:2024, IEC 62561 series, IEC 61643 series, IEC 60364, IEEE 80 | Apply where no Indian Standard exists, in the order IEC, then IEEE, then European Norms. They are also the basis for export projects. |
| 4 | Project specification | Owner, consultant and insurer requirements | May be stricter than the standards. Never weaker. |
Which document governs which part of the system.
Choose a pillar. Each row names the document, what it controls, and where LPES applies it.
| Document | What it governs | LPES solution and product |
|---|---|---|
| IEC 62305-1:2024 | General principles Lightning current parameters, the four lightning protection levels and the sources of damage S1 to S4. | Lightning Protection |
| IEC 62305-2:2024 | Risk management Risk R compared with a tolerable risk of 1 in 100,000 per year, and the frequency of damage F for internal systems. The result fixes the class of system and the SPD level. | Lightning Risk Assessment |
| IEC 62305-3:2024 | Physical damage and life hazard Design of the external system: air termination, down conductors, earth termination, bonding, separation distance, inspection. | Flat roof LPSIsolated LPSAir termination |
| IEC 62305-4:2024 | Electrical and electronic systems Protection against the lightning electromagnetic impulse: zones, bonding network, shielding, coordinated SPDs. | Surge protection by zone |
| IEC 62561-1 to -8 | Lightning protection system components Product tests: -1 connection components, -2 conductors and earth electrodes, -3 isolating spark gaps, -4 conductor fasteners, -5 inspection housings, -6 strike counters, -7 earth enhancing compounds, -8 components for isolated systems. | Connection componentsLPS conductorsStrike counters |
| IS/IEC 62305 | Indian adoption The Indian Standard route to the same requirements. Check which edition your project specification cites. | Standards updates |
| Document | What it governs | LPES solution and product |
|---|---|---|
| IS 3043:2026 | Earthing: code of practice (third revision) System earthing, protective earthing and bonding for land-based installations. Disconnection times, conductor sizing, electrode sizes and materials, substation earthing, testing. | Global earthing systemEarthing conductorsEarth electrodes |
| IS 732:2019 | Electrical wiring installations Design and verification of installations up to 1000 V AC: shock protection, cable sizing, protective conductors, inspection and test. | Equipotential bondingEarth bars |
| IEEE 80 | Safety in AC substation grounding Grid design for substations and switchyards: tolerable touch and step voltage, conductor sizing, grid resistance, mesh and step voltage. | Substation grid earthingEarth mats and grids |
| IS/IEC 61936-1 | Power installations above 1 kV AC Earthing of high-voltage installations: earth potential rise, permissible touch voltage, global earthing system. | Substation protectionStep and touch control |
| IEC 60364-6 | Verification Initial and periodic verification of low-voltage installations: continuity, insulation resistance, loop impedance, RCD tests. | Periodic inspection and testingEarth test instruments |
| Document | What it governs | LPES solution and product |
|---|---|---|
| IEC 61643-11 | SPDs for low-voltage power systems Product requirements and tests for Type 1, Type 2 and Type 3 devices: impulse current, nominal discharge current, voltage protection level. | Type 1 arrestersType 1+2 combinedType 2 SPDs |
| IEC 61643-21 | SPDs for telecom and signalling networks Devices for data, signal, measurement and control lines. | Data, signal and RF SPDs |
| IEC 61643-31 / -32 | SPDs for photovoltaic installations Product standard and selection rules for the DC side of PV systems. | Rooftop solar protectionDC and PV SPDs |
| IEC 61643-12 / -22 | Selection and application How to choose, coordinate and install SPDs on power and signal lines. | SPD Selector |
| IEC 60364-5-53 | Devices for protection and switching Where SPDs are required in an installation and how they are connected, including lead length and back-up protection. | SPD assembliesCritical facilities |
| Document | What it governs | LPES solution and product |
|---|---|---|
| CEA Reg. 38(3) | Lightning protection of buildings Lightning protection to the relevant standards for multi-storeyed buildings above 15 m and for hospitals, hotels, airports, academic buildings, industrial installations, places with explosive or flammable material, stations and other public buildings. | Lightning ProtectionHazardous areas |
| CEA Reg. 43 | Connection with earth, 50 V to 650 V Protective equipotential bonding in every building, two separate earth connections for equipment above 250 V and for every generator and transformer neutral, loop impedance tested so the protective device operates in time. | Equipotential bondingEarthing conductors |
| CEA Reg. 44 | Residual current device Supply controlled by an RCD. Not more than 30 mA for domestic installations. | Power Protection |
| CEA Reg. 50 | Connection with earth above 650 V An earth mat that limits touch and step potential and earth potential rise. Resistance tested on a dry day in the dry season at least once a year, with records kept. | Substation grid earthingInspection and testing |
| CEA Reg. 77 | Protection against lightning Overhead lines, substations and generating stations exposed to lightning must divert surges to earth. Arrester earth leads short, direct and without bends. | Substation protection |
| CEA Reg. 121 | Solar PV Earthing of all array structures, lightning and overvoltage protection, and an SPD in every combiner box. | Rooftop solar protectionPV string combiner boxes |
| CEA Reg. 124 | EV charging stations A lightning protection system to the relevant standards and earth continuity monitoring. | Power Protection |
Key values, with the clause they come from.
Quoted individually for reference. Always confirm against the licensed standard before a value goes into a design.
| Class of LPS | Rolling sphere radius | Mesh size | Down conductor spacing | Factor ki | Peak current |
|---|---|---|---|---|---|
| Class I | 20 m | 5 × 5 m | 10 m | 0.08 | 200 kA |
| Class II | 30 m | 10 × 10 m | 10 m | 0.06 | 150 kA |
| Class III | 45 m | 15 × 15 m | 15 m | 0.04 | 100 kA |
| Class IV | 60 m | 20 × 20 m | 20 m | 0.04 | 100 kA |
IEC 62305-3:2024, Tables 2, 5 and 11. The class comes from the IEC 62305-2 risk assessment and is never chosen by preference. Apply these values to your building
| Element | Minimum | Reference | Product family |
|---|---|---|---|
| Air termination and down conductor | 50 mm² in copper, aluminium, galvanised or stainless steel (tape, round or stranded) | IEC 62305-3, Table 7 | LPS conductors |
| Earth electrode in soil | Copper 50 mm², copper-bonded steel rod 14 mm, galvanised strip 90 mm², stainless rod 16 mm | IS 3043:2026, Table 26 | Earth electrodes |
| Bonding bar to earth termination | Copper 16 mm², aluminium 25 mm², steel 50 mm² | IEC 62305-3, Table 9 | Earth bars |
| Earthing conductor, main earthing terminal to electrode | At least 6 mm² copper or 50 mm² steel. 16 mm² copper where a lightning protection system is connected. Aluminium is not permitted. | IS 3043:2026, 7.3.3 | Earthing strips and cables |
| Main protective bonding conductor | Half the largest protective conductor, at least 6 mm² copper, need not exceed 25 mm² copper | IS 3043:2026, 7.3 | Equipotential bonding |
| Aluminium | Never in soil and never in concrete | IEC 62305-3, Table 6 | Corrosion protection |
| Structure | Visual inspection | Complete inspection with electrical tests |
|---|---|---|
| Normal structures | Every year | Every 3 years |
| Severe weather or high mechanical stress | Every 6 months | Every year |
| Structures with a risk of explosion | Every year | Every year |
| Sensitive internal systems, offices, places of assembly | Every year | Every year (complete inspection) |
IEC 62305-3:2024, Annex D.7. Also inspect after any alteration, repair or known strike. In India, earth resistance of HV and supplier earthing systems is tested at least once a year (CEA Regulations 43 and 50). Set up periodic inspection and testing
| Nominal voltage to earth (AC) | TN system | TT system |
|---|---|---|
| 50 to 120 V | 0.8 s | 0.3 s |
| 120 to 230 V | 0.4 s | 0.2 s |
| 230 to 400 V | 0.2 s | 0.07 s |
| Above 400 V | 0.1 s | 0.04 s |
IS 3043:2026, Table 1, for final circuits. Distribution circuits: 5 s in TN and 1 s in TT. Where protective equipotential bonding is not proven, the TT times apply to every circuit. In low-voltage installations the standard sets no minimum electrode resistance: protection rests on loop impedance and automatic disconnection. Check a loop impedance
Common practice against the published requirement.
| Common practice | What the standard says | Go to |
|---|---|---|
| Separate “dedicated” earth pits for each transformer, panel, lift or UPS | One interconnected, meshed earthing and bonding network. IS 3043:2026 lists separate and isolated electrodes among practices that shall not be followed. | Global earthing system |
| “Double earthing” means two pits in the ground | It means two separate connections to the earthing system. The CEA Regulations require two distinct connections, not two electrodes. | Equipotential bonding |
| A low earth resistance value proves the installation is safe | In low voltage, safety rests on loop impedance and disconnection time. In high voltage, it rests on touch and step voltage. | Step and touch voltage control |
| A lightning protection system protects the electronics inside | An external system with bonding SPDs prevents dangerous sparking only. Electronics need coordinated SPDs to IEC 62305-4. | Surge protection by zone |
| Earth enhancing compound improves any earth | IS 3043:2026 limits it to resistivity above 3000 Ω·m, for lightning protection, and bars it below 200 Ω·m. | Earth enhancing compounds |
Tested to, built to, complies with.
LPES products are built and tested to the product standards that apply to them, and LPES designs are prepared to comply with the installation standards named in the design basis. These are different claims and we keep them apart.
Product standards such as IEC 62561 and IEC 61643 define type tests. A product can be tested to them.
Installation standards and codes of practice such as IEC 62305-3 and IS 3043 define how a system is designed, installed and verified. An installation complies with them. It is not “certified to” them.
Compliance of an installation is demonstrated by inspection and test by competent persons and accepted by the Electrical Inspector or the authority having jurisdiction. See LPES certifications and approvals

Short answers, with the clause.
Is lightning protection mandatory in India?
For many buildings, yes. Regulation 38(3) of the CEA Regulations 2023 requires lightning protection to the relevant standards for multi-storeyed buildings above 15 m and for a list of premises that includes hospitals, hotels, airports, academic buildings, industrial installations and places holding explosive or flammable material. For other structures the need is decided by a risk assessment to IEC 62305-2. Assess your structure
Which standard does lightning protection follow in India?
The CEA Regulations refer to the relevant Indian Standards, the National Electrical Code and the National Building Code. In practice that means IS/IEC 62305, with components to the IEC 62561 series. Lightning protection solutions
Is IS 3043 mandatory?
The foreword to IS 3043:2026 states that the Electricity Act 2003, read with Regulation 14 of the CEA Regulations 2023, makes compliance with Indian Standards, including IS 3043, mandatory. Earthing solutions
Are surge protective devices mandatory?
The CEA Regulations require them explicitly for solar PV combiner boxes (Regulation 121) and require surge diversion for lines, substations and generating stations (Regulation 77). Elsewhere the need follows from the IEC 62305-2 risk assessment and IEC 60364. Where a lightning protection system is installed, Type 1 SPDs at the service entrance are required by IEC 62305. Select an SPD
What earth resistance must a lightning protection earth achieve?
IEC 62305-3 recommends below 10 Ω where possible, measured at low frequency. For a Type A arrangement the minimum electrode length may be waived when each electrode is below 10 Ω. Rod earthing (Type A)
How long must test records be kept?
Suppliers must keep earth test records for at least two years and make them available to the Electrical Inspector (Regulation 43). We recommend keeping every record for the life of the installation. Monitoring and record
Request a compliance review.
We review drawings, test records and the installed system against the CEA Regulations, IS 3043 and IS/IEC 62305, and report each item as complies, does not comply or not demonstrated.
This page summarises published requirements for guidance. It does not replace the licensed standards, the Gazette text of the regulations or later amendments, and it is not a certificate of compliance. Design and verification must be carried out by competent persons.