LPES International
LPES International
Protection to Perfection
Currency
0
0
Industries Data Centres

Protecting the Heartbeat of the Digital World

Lightning, earthing and surge protection for data centres

Uptime is designed in megawatts and milliseconds. The protection has to match: an external LPS that keeps lightning current off the roof plant, a bonding network that holds every rack at one potential, and coordinated SPDs from the MV/LV intake down to the rack.

Request a coordinated assessment
LPZ 0 → 3lightning protection zones stepped down from the roof to the rack, as defined in IEC 62305-4
3 stagesType 1+2 at the intake, Type 2 at UPS and PDU level, Type 3 at sensitive equipment
1 eartha single interconnected earthing system with a meshed bonding network in every technical room
The riskData centre equipment is damaged by voltage differences inside the building, not by a high earth resistance reading.
The LPES answerLPES combines a roof LPS, a TN-S mesh bonding network and Type 1, Type 2 and Type 3 SPDs in coordinated stages.
The ruleIS 3043:2026 makes TN-S with a mesh bonding network mandatory for data centres and does not permit separate clean earths.
Cutaway of a data centre showing generator yard, cooling plant, MV/LV rooms, UPS, battery room, data hall and network room, marked with LPES protection points
LPES protection map
Data Centres
Lightning protectionEarthing & bondingSurge protectionSelect a point to see the threat, the LPES measure and the product families.
1Lightning protection

Roof and cooling units

Threat
Direct strikes to rooftop plant and the pipework that leads inside.
LPES measure
Meshed air termination on the roof with rods that place every chiller and AHU inside the protected volume. Separation distance is kept, or the unit is bonded and its cables protected at the zone boundary.
Families
The problem

Lightning, earthing and surge risks on data centre sites

Strikes to roof plant

Chillers, dry coolers and AHUs sit on the roof and connect straight into the building by pipe and cable. Unprotected, they bring partial lightning current into the white space.

Potential differences between racks

Low earth resistance alone does not help. Without a meshed bonding network, surge current creates voltage between cabinets and across data ports.

Switching surges inside the power chain

Utility events, generator transfer, STS operation and large chiller motors create transients on both sides of the UPS, every day.

Copper lines that bypass the protection

Perimeter CCTV, gate automation, BMS outstations and carrier entries all cross the zone boundary. One unprotected line undoes the rest.

The LPES answer

One coordinated lightning protection, earthing and surge protection system

Four pillars. Connected protection. Clear accountability.

Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

LPES L shield

Lightning protection

The building steel and reinforcement are used as natural down conductors and connected to a foundation earth electrode. On the roof, a mesh with rods protects the cooling plant. Where separation distance cannot be kept, isolated air termination keeps lightning current away from pipework and cable trays.

LPES P shield

Power protection

Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

LPES E shield

Earthing protection

Safety earthing, lightning earthing and telecom bonding are one system, joined at the main earthing terminal. IS 3043:2026 makes TN-S with a mesh bonding network mandatory for data centres. Inside, a meshed bonding network gives surge current many short paths, so no single rack sees the voltage.

LPES S shield

Surge protection

SPDs are placed where conductors cross a zone boundary. Type 1+2 at the service entrance, Type 2 through the UPS and PDU chain, Type 3 and data-line SPDs at BMS, EPMS, security and network equipment. Status contacts report to the monitoring system.

Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.

Protective conductors

Earthing and PE conductors: what protects people, and what CEA 2023 requires

An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.

Transformersource neutralMain earthing terminalEquipment framemotor, panel, skidSteel, pipes, traysEarth grid and electrodes12345Drag to rotate
Auto tour · select any point to stop
Conductor 3 of 5

Protective earthing (PE) conductor

Main earthing terminal to the frame of every piece of equipment

In a data centre. UPS, chillers and room cooling units run 24 × 7. A loose PE leaves a frame live and puts leakage current into the bonding network.

Rule
CEA Reg 43(vii): two separate and distinct connections for apparatus above 250 V. Reg 43(ix): carries the prospective earth-fault current.
Limit
Earth-fault loop impedance: measured Zs ≤ ⅔ × U0 / Ia, so the device disconnects in 0.4 s at 230 V and 0.2 s above 230 V on TN final circuits.
Sizing
IS 3043:2026, Table 12, same material as the line conductor S: equal to S up to 16 mm², 16 mm² for S from 16 to 35 mm², S/2 above 35 mm². Or by the adiabatic equation S = √(I²t) / k.
Material
Insulated green-yellow copper cable, copper tape or copper-bonded conductor, with crimped lugs at both ends. No soldered joints and no switch in the PE.
Families

On your data centre site

TN-S inside the building: neutral and PE are separate from the main board onward. A PE conductor goes with every feeder to UPS, PDU, busway and rack, sized for the fault level. Where leakage current is high, the PE is reinforced or duplicated. Insulated green-yellow copper is used for PE and bonding, copper tape for the mesh.

  • Reg 43(v)Every building has protective equipotential bonding that interconnects exposed and extraneous conductive parts.
  • Reg 43(ix)Bonding conductors carry the prospective earth-fault current and are tested for effective bonding before energisation.
  • Reg 43(xi), (xii)Earth-fault loop impedance is tested so the protective device disconnects in time.
  • Reg 43(xiii)The neutral point of every generator and transformer is earthed by not less than two separate connections.

Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.

Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.

Want this checked against your plant?Send the single line diagram and layout. An LPES engineer reviews earthing, PE conductors and lightning protection against CEA 2023 and IS 3043:2026.
Call 080 4388 8915WhatsApp
Design values

LPS class, SPD rating and conductor sizes for data centre projects

The figures engineers look up most, with the clause behind each. Rows marked in red are specific to data centre sites.

ItemValueSource
System earthingTN-S with a mesh bonding network (MESH-BN)IS 3043:2026, 11.8
Bonding ring to reinforcementEvery 5 m in computer and communication buildingsIEC 62305-3:2024, D.6
Bonding network meshTypically 5 m, tied to rebar every 1 to 2 mIEC 62305-4:2024, 5.3
Separate “clean” earthsNot permitted. One interconnected earthing networkIS 3043:2026, 6.3
Rolling sphere radius20 / 30 / 45 / 60 m for LPS Class I / II / III / IVIEC 62305-3:2024, Table 2
Air-termination mesh5 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 2
Down-conductor spacing10 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 5
LPS conductor, minimum50 mm² in copper, aluminium, galvanised or stainless steelIEC 62305-3:2024, Table 7
Lightning earthRing electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 ΩIEC 62305-3:2024, 5.4
Entrance SPD where an LPS existsType 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IVIEC 62305-4:2024, Table C.3
SPD connecting leads0.5 m total or less, line to SPD to earth barIEC 62305-4:2024, Annex C
Second SPDNeeded when equipment is more than 10 m from the entrance SPDIEC 62305-4:2024, Annex C
Bonding bar to earth16 mm² copper, 25 mm² aluminium or 50 mm² steelIEC 62305-3:2024, Table 9
Disconnection time, TN final circuits0.4 s at 230 V, 0.2 s above 230 VIS 3043:2026, Table 1
Loop impedance, measuredZs ≤ ⅔ × U0 / IaIS 3043:2026 and IS 732
PE and bonding continuityWithin the conductor’s own resistance, tested at about 10 AIS 3043:2026, Annex E

The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.

Component standards

Every part of the data centre protection system has its own test standard

IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.

ComponentWhat the standard provesStandard
Clamps, connectors and bonding partsEach joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA.IEC 62561-1
Conductors and earth electrodesSets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper.IEC 62561-2
Isolating spark gapsJoins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike.IEC 62561-3
Conductor holders and fixingsHolders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures.IEC 62561-4
Earth pit housings and electrode sealsInspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab.IEC 62561-5
Lightning strike countersThe counter records each strike carried by a down conductor. A new count is the trigger for an inspection.IEC 62561-6
Earth enhancing compoundsThe compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it.IEC 62561-7
Surge protective devicesPart 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants.IEC 61643-11, IEC 61643-21, IEC 61643-31
PE, bonding and earthing conductorsSets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame.IEC 60364-5-54, IS 3043:2026, IS 732:2019

LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.

Need the bill of material for your data centre project?Share the drawings and LPES returns a specified, priced list across lightning protection, earthing and surge protection.
Call 080 4388 8915WhatsApp
From the LPES range

What goes into your data centre project

Each card opens the product family in the LPES catalogue.

LPES Earthing strips, tapes and cables
Earthing strips, tapes and cablesPE, bonding and earthing conductors in copper, copper-bonded and galvanised steelView family ›
LPES Copper-bonded round conductor
Copper-bonded round conductorCoils for down conductors, ring earths and bonding runsView family ›
LPES Galvanised flat conductor
Galvanised flat conductorHot-dip galvanised strip for grids and structure bondingView family ›
LPES Bridging braids and flexible links
Bridging braids and flexible linksBonds across joints, doors, trays and moving partsView family ›
LPES Earth bars and terminals
Earth bars and terminalsMain earthing terminals and local bonding barsView family ›
LPES Clamps and connectors
Clamps and connectorsJoints for round and flat conductors, built and comply to IEC 62561-1View family ›
LPES Conductor holders
Conductor holdersRoof, wall and structure fixings for LPS conductorsView family ›
LPES Earth electrodes, pits and backfill
Earth electrodes, pits and backfillRods, enhancement compound, pit chambers and test platesView family ›
LPES Surge protective devices
Surge protective devicesType 1+2, Type 2 and Type 3 for AC, DC, PV and signal linesView family ›
Scope

Areas LPES covers in data centres

  • Hyperscale and colocation halls
  • Edge and modular data centres
  • MV/LV substations and switch rooms
  • UPS and battery rooms
  • Generator and fuel yards
  • Chiller plant and cooling towers
  • Meet-me rooms and carrier entries
  • NOC, BMS and security systems
Two-minute check

Is your data centre site ready for an inspection?

Six points an Electrical Inspector or an insurer will ask about.

  1. Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
  2. Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
  3. Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
  4. Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
  5. The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
  6. SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Your result
0 of 6 in place

Answer the six points for your site. Nothing is sent anywhere until you ask.

By role

What each person on a data centre project asks

Plant electrical headWhen did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?

LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.

Testing & Measurement
How we work

Lightning to Load

Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.

Calculated. Coordinated. Implemented. Verified.

  1. AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
  2. DesignLPS, earthing and SPD design with calculations and drawings
  3. SpecifyBill of materials with LPES part numbers and data sheets
  4. SupplyProducts from one source, tested to IEC 62561 and IEC 61643
  5. ImplementInstallation supervision or turnkey execution
  6. VerifyContinuity, earth resistance and SPD checks, recorded
  7. AssurePeriodic inspection, monitoring and AMC

LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.

LPES services
Standards

Built and comply to

  • CEA Safety Regulations 2023
  • IEC 62305-1 to -4
  • ISO/IEC 22237-3
  • ISO/IEC 30129
  • ANSI/TIA-942
  • IEC 61643-11 and -21
  • IEC 60364-4-44 and -5-54
  • IS 3043:2026
  • IS 732:2019

The applicable edition and any project or statutory specification are confirmed at the design stage.

Questions engineers ask

Data Centres lightning protection and earthing: frequently asked questions

Is a low earth resistance value enough for a data centre?
No. Earth resistance matters for fault clearing and lightning dissipation, but IT equipment is damaged by voltage differences between points inside the building. That is controlled by equipotential bonding: a meshed network with short, low-impedance bonds to every rack and tray.
Related: Equipotential Bonding ›
Where should SPDs be installed in the power chain?
At every point where a conductor crosses a lightning protection zone boundary. In practice: Type 1+2 at the main LV switchboards, Type 2 at UPS input, bypass and output and at PDU or RPP level, and Type 3 close to sensitive loads. The stages must be coordinated by voltage protection level and distance.
Related: AC Power SPDs ›
How are rooftop chillers protected from direct strikes?
The unit is placed inside the protected volume of air-termination rods using the rolling sphere method, and the separation distance between the LPS and the unit is checked. If it cannot be kept, the unit is bonded to the LPS and its power and control cables get SPDs where they enter the building.
Related: Isolated Air-Termination ›
Which protection level does a data centre need?
That is decided by an IEC 62305-2 risk assessment using the building, its contents and the local flash density, not by a rule of thumb. LPES runs the assessment and issues the result with the design basis.
Related: Audit & Compliance ›

Engineering guides from the LPES knowledge hub

  • Data centres: earthing and bonding
  • ICT: functional earthing and telecommunications bonding networksHB-ID-537
  • Types of protective earthing conductors and their electrical continuityHB-ID-530
  • Earthing conductor and protective bonding conductor sizingHB-ID-528
  • Main earthing terminal / main earth busbar (MET)HB-ID-529
  • Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
  • Measurement of earth fault loop impedance
  • Continuity resistance measurement

Related industries

Sector

  • Digital InfrastructureSector hub
  • All industries/industries
Still deciding where to start?Most data centre sites start with a risk assessment and an earthing audit. Talk to an LPES engineer today.
Call 080 4388 8915WhatsApp

Your power is connected. Is your protection?

Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.

Talk to LPES about a coordinated assessment for your data centre project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.

WhatsAppMessage LPES
OfficesBudapest, Hungary, Europe · Gurugram, India
Takes 20 seconds

Get a call back from an LPES engineer

Name and number. That is all. No drawings, GST details or part numbers needed now.

Add details, optional

An LPES engineer calls you within one working day. Your details go to LPES only. Prefer to talk now? 080 4388 8915

In the digital era, data centers are not merely buildings they are the nerve centers of global connectivity, commerce, governance, and innovation. Every second of uptime carries value; every second of downtime carries consequence. Among the many risks data centers face, lightning induced outages and electrical surges remain one of the most underestimated yet destructive threats.

At LPES International, we engineer shield like protection ecosystems that preserve data center uptime, protect critical IT infrastructure, safeguard human lives, and ensure uninterrupted digital continuity using LPES Lightning Protection, Surge Protection, Earthing, and Equipotential Bonding solutions.

Illustration of lightning-induced downtime affecting a data centre

Lightning Induced Downtime in Data Centers

When lightning strikes directly or
indirectly it does not announce itself. It
travels silently through

  • Power supply lines
  • Data and communication cables
  • Earthing systems
  • Metallic structures and rooftop installations

Even a distant lightning event can cause
transient overvoltages and ground potential rise,leading to:

  • Sudden shutdown of servers and storage systems
  • Failure of UPS, PDUs, and power distribution panels
  • Data corruption, packet loss, and networkinstability
  • Damage to BMS, fire detection, and monitoringsystems
  • Risk to on site manpower during surge events

For data centers, such downtime results in SLA breaches, financial penalties, reputational damage, andirreversible dataloss. In an industry built on trust and continuity, lightning becomes a business-critical risk.

Core keywords embedded: data center downtime, lightning risk in data centers, electrical surge impact, IT infrastructure failure

Data centers operate with advantages and responsibilities that few industries carry

  • 24/7, mission critical operations

  • Massive investment in servers, storage, and networking

  • Dependence on stable power and clean earthing

  • Responsibility for safeguarding sensitive databases and digital assets

  • High human concentration in technical and operational zones

However, these strengths also create vulnerabilities. Dense electronics, high speed data flow, and interconnected systems mean that a single surge can cascade across multiple layers of infrastructure vulnerabilities. 

This is why data centers require far more than basic lightning rods they demand integrated, engineered electrical protection systems aligned with global best practices.


The LPES Shield: End to End Protection for DataCenters

At LPES International, we provide data centers with a multi layered protection shield, ensuring that lightning energy is intercepted, controlled, equalized, and safely dissipated before it reaches criticalsystems or people.

1. Lightning Protection Systems (LPS)

LPES external lightning protection systems safeguard:
  • Rooftops, antennas, lightning masts, HVACunits
  • Metallic structures and exposed installations
By safely capturing and directing lightning energy to earth, our systems prevent direct strike damage, fire hazards, and structural risks.
The LPES Shield — end-to-end lightning protection over a data centre
Surge protection for data centre power and IT network lines

2. Surge Protection for Power & IT Networks

Our LPES Surge Protection Devices (SPDs) provide layered defense for:
  • Utility incomers, HT/LT panels, UPS, DG sets
  • Server racks, PDUs, and power distribution units
  • Data, fiber, Ethernet, and communication lines
This ensures protection against transient overvoltage, preserving server health, data integrity, and system uptime.

Earthing Systems The Backbone of Stability

  • LPES designs low resistance, high performance earthing systems that:
  • Control fault currents and lightning discharge
  • Stabilize reference voltage for sensitive IT equipment
  • Enhance effectiveness of SPDs and lightning protection
  • We provide clean earthing, safety earthing, and functional earthing, tailored to data center requirements.
Data centre with external down conductors and a buried earthing grid
Equipotential bonding and earthing network beneath a data centre raised floor

Equipotential Bonding Protecting Manpower & Electronics

Equipotential bonding ensures that all conductive parts racks, trays, panels, metallic floors remain at the same electrical potential,eliminating:
  • Shock hazards to operating personnel
  • Voltage differences that damage electronics
  • Hidden EHS risks during surge events
This layer is critical for human safety, EHS compliance, and long-term system reliability.

What LPES Protects in a Data Center

Our solutions collectively safeguard:

Buildings & Infrastructure: structure, rooftops, utilities Critical Assets: servers, storage, networking hardware Power Systems: UPS, DG, transformers, PDUs
Databases & IT Fields: data integrity, network uptime Manpower: engineers, operators, maintenance teams
By integrating lightning protection, surge protection, earthing, and bonding, LPES delivers true operational resilience.
Integrated lightning, earthing and surge protection around a data centre

LPES Protecting Uptime, Preserving Trust:

For data centers, protection is not optional it is foundational. LPES does not simply install equipment;we engineer assurance, ensuring that your digital infrastructure remains secure against nature’s most unpredictable forces.

LPES International stands as a trusted partner to data centers worldwide shielding data, systems, andpeople, every second, every strike.

Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.