Lightning, earthing and surge protection for mines and mineral processing
A mine spreads crushers, conveyors, substations and processing plants across kilometres of open, often rocky ground, and its people work outside through every storm. LPES protects the exposed structures, earths a site where soil resistivity is high and distances are long, protects drives, SCADA and remote instruments from surges, and gives early warning before lightning reaches the pit.

Mining
Pit power, shovels and trailing cables
- Threat
- Mobile substations and trailing cables feeding electric shovels and drills in the pit.
- LPES measure
- Earth continuity monitoring on trailing cables, mobile substation frames bonded to the pit earth and an earth fault protection scheme matched to the pit distribution.
- Families
Lightning, earthing and surge risks on mine site sites
People in open ground
Drillers, shovel operators, blast crews and conveyor patrols work in the open. A storm approaching the pit is a direct risk to life, and to the blast pattern.
Tall, exposed structures over long distances
Crusher buildings, transfer towers, stackers, headframes and communication towers stand alone in open ground, connected by kilometres of conveyor and cable.
Rocky, dry, high-resistivity ground
Ore bodies are found in ground where a driven rod barely reaches soil. Earthing has to be designed for the ground, and remote substations and structures still have to be bonded.
Large drives and long control lines
Mill, crusher and conveyor drives are among the largest in industry. Their controls, weighers and remote I/O run on long field cables that pick up induced surges.
One coordinated lightning protection, earthing and surge protection system
Four pillars. Connected protection. Clear accountability.
Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

Lightning protection
Crusher buildings, transfer towers, stackers, headframes, communication towers and remote sites are assessed on the lightning risk of each one. Structural steel is used as a natural component where continuity is proven, and a lightning warning system covers the pit and the benches.

Power protection
Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

Earthing protection
Each area has its own grid designed for the measured soil, and the grids are interconnected along conveyor and cable routes. Remote structures and substations are bonded, trailing cables carry monitored earth continuity, and corrosive areas use materials chosen for their life.

Surge protection
Protection follows the power and control path. Type 1+2 at each substation board, Type 2 at drive and MCC panels, Type 3 and signal SPDs at PLC, SCADA, weighers and remote I/O, and coaxial SPDs on radio and fleet communication.
Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.
Earthing and PE conductors: what protects people, and what CEA 2023 requires
An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.
On your mine site site
Crusher, mill and conveyor motors above 250 V get two separate earth connections. Copper conductors sized for the fault level are used for equipment earthing, galvanised or copper-bonded strip for structures and conveyors, and flexible braids for vibrating screens and crushers.
- Reg 43(vii)Frames of motors and control apparatus above 250 V are earthed by two separate and distinct connections.
- Reg 50(2)Generator and transformer neutrals above 650 V are earthed by not less than two separate connections.
- Reg 50(1)Substation earthing limits touch potential, step potential and earth potential rise.
- Reg 50(8)Earth resistance is tested on a dry day at least once a year and the record is kept.
Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.
Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.
LPS class, SPD rating and conductor sizes for mine site projects
The figures engineers look up most, with the clause behind each. Rows marked in red are specific to mine site sites.
| Item | Value | Source |
|---|---|---|
| Earth-enhancing compound | Only above 3000 Ω·m and only for the lightning earth | IS 3043:2026, 8.1.7 |
| Substation earth grid | Designed on touch and step voltage, not on a resistance figure | IS 3043:2026, cl. 10 · IEEE 80 |
| Steel frame or rebar as down conductor | Overall continuity 0.2 Ω or less, measured four-wire at about 10 A | IEC 62305-3:2024, D.5.3.5 |
| Structures above 60 m | Protect the top 20 % of the height against side flashes | IEC 62305-3:2024, 5.2.3 |
| Rolling sphere radius | 20 / 30 / 45 / 60 m for LPS Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Air-termination mesh | 5 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Down-conductor spacing | 10 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 5 |
| LPS conductor, minimum | 50 mm² in copper, aluminium, galvanised or stainless steel | IEC 62305-3:2024, Table 7 |
| Lightning earth | Ring electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 Ω | IEC 62305-3:2024, 5.4 |
| Entrance SPD where an LPS exists | Type 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IV | IEC 62305-4:2024, Table C.3 |
| SPD connecting leads | 0.5 m total or less, line to SPD to earth bar | IEC 62305-4:2024, Annex C |
| Second SPD | Needed when equipment is more than 10 m from the entrance SPD | IEC 62305-4:2024, Annex C |
| Bonding bar to earth | 16 mm² copper, 25 mm² aluminium or 50 mm² steel | IEC 62305-3:2024, Table 9 |
| Disconnection time, TN final circuits | 0.4 s at 230 V, 0.2 s above 230 V | IS 3043:2026, Table 1 |
| Loop impedance, measured | Zs ≤ ⅔ × U0 / Ia | IS 3043:2026 and IS 732 |
| PE and bonding continuity | Within the conductor’s own resistance, tested at about 10 A | IS 3043:2026, Annex E |
The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.
Every part of the mine site protection system has its own test standard
IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.
| Component | What the standard proves | Standard |
|---|---|---|
| Clamps, connectors and bonding parts | Each joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA. | IEC 62561-1 |
| Conductors and earth electrodes | Sets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper. | IEC 62561-2 |
| Isolating spark gaps | Joins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike. | IEC 62561-3 |
| Conductor holders and fixings | Holders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures. | IEC 62561-4 |
| Earth pit housings and electrode seals | Inspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab. | IEC 62561-5 |
| Lightning strike counters | The counter records each strike carried by a down conductor. A new count is the trigger for an inspection. | IEC 62561-6 |
| Earth enhancing compounds | The compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it. | IEC 62561-7 |
| Surge protective devices | Part 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants. | IEC 61643-11, IEC 61643-21, IEC 61643-31 |
| PE, bonding and earthing conductors | Sets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame. | IEC 60364-5-54, IS 3043:2026, IS 732:2019 |
LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.
What goes into your mine site project
Each card opens the product family in the LPES catalogue.









Areas LPES covers in mining
- Open-pit and underground mines
- Primary, secondary and tertiary crushing
- Overland conveyors and stockpiles
- Grinding mills and classification
- Flotation, thickening and filtration
- Tailings, mine water and dewatering
- Mine substations and distribution
- SCADA, radio and fleet management
Is your mine site site ready for an inspection?
Six points an Electrical Inspector or an insurer will ask about.
- Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
- Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
- Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
- Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
- The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
- SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Answer the six points for your site. Nothing is sent anywhere until you ask.
What each person on a mine site project asks
When did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?
LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.
Testing & MeasurementLightning to Load
Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.
Calculated. Coordinated. Implemented. Verified.
- AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
- DesignLPS, earthing and SPD design with calculations and drawings
- SpecifyBill of materials with LPES part numbers and data sheets
- SupplyProducts from one source, tested to IEC 62561 and IEC 61643
- ImplementInstallation supervision or turnkey execution
- VerifyContinuity, earth resistance and SPD checks, recorded
- AssurePeriodic inspection, monitoring and AMC
LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.
LPES servicesBuilt and comply to
- CEA Safety Regulations 2023
- IEC 62305-1 to -4
- IEC 62561 series
- IEC 61643-11 and -21
- IEC 62793
- IEC 60364-5-54
- IEEE 80
- IS 3043:2026
- CEA Safety Regulations 2023
The applicable edition and any project or statutory specification are confirmed at the design stage.
Mining lightning protection and earthing: frequently asked questions
How does a lightning warning system help at a mine?
Related: Lightning Detection & Warning ›
How do you earth a site on rock?
Related: Earth Enhancing Compounds ›
Should every structure get lightning protection?
Related: Audit & Compliance ›
Why do conveyors need bonding?
Related: Bonding Clamps & Leads ›
Engineering guides from the LPES knowledge hub
- Earthing of installations with higher protective conductor currentHB-ID-536
- Supplementary bonding and installations with increased shock riskHB-ID-533
- Types of protective earthing conductors and their electrical continuityHB-ID-530
- Earthing conductor and protective bonding conductor sizingHB-ID-528
- Main earthing terminal / main earth busbar (MET)HB-ID-529
- Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
- Measurement of earth fault loop impedance
- Continuity resistance measurement
Related industries
- CementIndustry page
- Steel & MetalsIndustry page
- Power IndustryIndustry page
- Oil & GasIndustry page
More in Oil, Gas & Hazardous
- Oil, Gas & HazardousSector overview
- All industriesIndustries overview
Your power is connected. Is your protection?
Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.
Talk to LPES about a coordinated assessment for your mine site project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.

