The LPES way of working

Lightning to Load: one method, from the strike point to the last connected load.

Most sites buy lightning protection from one firm, earthing from another and surge protection inside a panel package. The risk crosses those boundaries and nobody owns the gap. Lightning to Load puts the whole chain under one engineering responsibility, in seven stages.

LPES L shieldLPES P shieldLPES E shieldLPES S shield

Calculated. Coordinated. Implemented. Verified.

The seven stages

Assess. Design. Specify. Supply. Implement. Verify. Assure.

Select a stage to see what is done and what you receive.

Stage 01

Assess

Understand the exposure before anything is drawn.

  • Lightning risk assessment to IEC 62305-2
  • Soil resistivity survey
  • Audit of existing earthing, lightning protection and SPDs

You receive
Risk assessment report and site audit

Lightning Risk Assessment
Stage 02

Design

Turn the assessment into a coordinated design.

  • Air termination and down conductor layout
  • Earthing calculation and bonding scheme
  • Lightning protection zones and SPD schedule

You receive
Design basis, drawings and calculations

Design and engineering
Stage 03

Specify

Fix exactly what is to be supplied and to which standard.

  • Bill of quantities with item codes
  • Specification text and datasheets
  • Approval pack for the consultant

You receive
BOQ, specification and approval pack

BOQ / Tender Support
Stage 04

Supply

Deliver components built and tested to the product standards.

  • Lightning protection components
  • Earthing, PE and bonding conductors with accessories
  • Surge protective devices and assemblies

You receive
Materials with datasheets and test references

LPES products
Stage 05

Implement

Install to the drawing, with every joint recorded.

  • Installation by trained crews
  • Exothermic and mechanical joints to method
  • Inspection of concealed parts before they are covered

You receive
As-built drawings and joint register

Installation and commissioning
Stage 06

Verify

Prove by test that the installation performs.

  • Continuity and earth resistance tests
  • Loop impedance tests for every source
  • Visual inspection against the design

You receive
Test report with each item marked

Inspection and testing
Stage 07

Assure

Keep it performing for the life of the facility.

  • Periodic inspection and testing
  • SPD and strike monitoring
  • Records kept current for the inspector

You receive
LPES Protection Passport, kept up to date

Annual maintenance contract
The signature deliverable

The LPES Protection Passport.

Every Lightning to Load project ends in one controlled dossier for the facility: the risk assessment, the design basis, as-built drawings, product data, test reports and the inspection history. It is what an inspector, an insurer or a new plant engineer asks for, in one place.

  • One record for lightning protection, earthing and surge protection
  • Updated at every inspection
  • Each item marked complies, does not comply or not demonstrated
Monitoring and record
LPES International protection for industrial facilities
Questions

About the method.

Do I have to take all seven stages?

No. Many clients start with an assessment or a design review and continue from there. The stages are built to hand over cleanly. Request a site assessment

Can Lightning to Load be applied to an existing plant?

Yes. It starts with an audit of what is installed and a gap list against the current standards. Periodic inspection and testing

What is different from buying the three packages separately?

One party calculates, coordinates and verifies the whole chain, so the earthing matches the lightning protection and the SPDs match both. Global earthing system

Bring your electrical protection together

Understand your risks. Coordinate your protection. Know who owns each responsibility.

Tell us about your facility and an engineer will reply with where to start.

Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.