Lightning, earthing and surge protection for defence and government facilities
Defence and government sites must stay operational through any weather. Air bases, radar and communication stations stand in open ground with tall towers, hangars hold aircraft and weapons, and command centres run systems that cannot fail. LPES protects structures, towers and storage against lightning, builds bonded earthing for aircraft, vehicles and fuel, and protects radar, communication and command systems against surges, to the requirements of each service.

Government & Military
Aircraft hangars
- Threat
- Large steel hangars housing aircraft, tools and maintenance equipment.
- LPES measure
- Metal roof as natural air termination where it qualifies, steel frame as down conductors, and static grounding points inside for aircraft under maintenance.
- Families
Lightning, earthing and surge risks on defence or government site sites
Tall towers in open ground
Radar, communication masts, ATC towers and lighting masts are the highest points on flat, open bases. They take most of the strikes on the site.
Fuel, ordnance and aircraft
Refuelling, ammunition storage and armed aircraft make lightning and static an ignition risk. Bonding and grounding procedures are part of operations.
Systems that cannot fail
Radar, navigation, ATC and command networks run on sensitive electronics linked by long cables across the site.
Remote and mobile assets
Remote radar heads, communication relays and mobile shelters need protection that works wherever they are deployed.
One coordinated lightning protection, earthing and surge protection system
Four pillars. Connected protection. Clear accountability.
Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

Lightning protection
Hangars, towers, radar, ATC, storage and buildings are each assessed on lightning risk and on the requirements of the service. Steel structures serve as natural components, and explosives storage follows its own isolated or separated protection rules.

Power protection
Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

Earthing protection
One bonded earthing system for the base, with static grounding for aircraft and refuelling, earth points for vehicles and shelters, and portable earthing for deployed equipment.

Surge protection
Protection follows every line into mission systems. Type 1+2 at building and shelter entries, Type 2 at sub-boards, and coaxial, data and DC SPDs on radar, communication and command links.
Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.
Earthing and PE conductors: what protects people, and what CEA 2023 requires
An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.
On your defence or government site site
Radar, HVAC, pump and generator frames above 250 V get two separate earth connections. Aircraft and vehicle grounding points connect to the same base earth, and mobile equipment carries its own earthing set.
- Reg 43(vii)Frames of motors and control apparatus above 250 V are earthed by two separate and distinct connections.
- Reg 50(2)Generator and transformer neutrals above 650 V are earthed by not less than two separate connections.
- Reg 50(1)Substation earthing limits touch potential, step potential and earth potential rise.
- Reg 50(8)Earth resistance is tested on a dry day at least once a year and the record is kept.
Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.
Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.
LPS class, SPD rating and conductor sizes for defence or government site projects
The figures engineers look up most, with the clause behind each. Rows marked in red are specific to defence or government site sites.
| Item | Value | Source |
|---|---|---|
| Explosives and ammunition storage | LPS, bonding and SPDs as the explosives regulations and service requirements specify | IEC 62305-3:2024 · service requirements |
| Structures above 60 m | Protect the top 20 % of the height against side flashes | IEC 62305-3:2024, 5.2.3 |
| Substation earth grid | Designed on touch and step voltage, not on a resistance figure | IS 3043:2026, cl. 10 · IEEE 80 |
| Links between buildings | Metal-free fibre, or bonded metal ducts with SPDs at both ends | IEC 62305-4:2024, Annex B |
| Rolling sphere radius | 20 / 30 / 45 / 60 m for LPS Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Air-termination mesh | 5 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Down-conductor spacing | 10 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 5 |
| LPS conductor, minimum | 50 mm² in copper, aluminium, galvanised or stainless steel | IEC 62305-3:2024, Table 7 |
| Lightning earth | Ring electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 Ω | IEC 62305-3:2024, 5.4 |
| Entrance SPD where an LPS exists | Type 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IV | IEC 62305-4:2024, Table C.3 |
| SPD connecting leads | 0.5 m total or less, line to SPD to earth bar | IEC 62305-4:2024, Annex C |
| Second SPD | Needed when equipment is more than 10 m from the entrance SPD | IEC 62305-4:2024, Annex C |
| Bonding bar to earth | 16 mm² copper, 25 mm² aluminium or 50 mm² steel | IEC 62305-3:2024, Table 9 |
| Disconnection time, TN final circuits | 0.4 s at 230 V, 0.2 s above 230 V | IS 3043:2026, Table 1 |
| Loop impedance, measured | Zs ≤ ⅔ × U0 / Ia | IS 3043:2026 and IS 732 |
| PE and bonding continuity | Within the conductor’s own resistance, tested at about 10 A | IS 3043:2026, Annex E |
The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.
Every part of the defence or government site protection system has its own test standard
IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.
| Component | What the standard proves | Standard |
|---|---|---|
| Clamps, connectors and bonding parts | Each joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA. | IEC 62561-1 |
| Conductors and earth electrodes | Sets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper. | IEC 62561-2 |
| Isolating spark gaps | Joins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike. | IEC 62561-3 |
| Conductor holders and fixings | Holders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures. | IEC 62561-4 |
| Earth pit housings and electrode seals | Inspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab. | IEC 62561-5 |
| Lightning strike counters | The counter records each strike carried by a down conductor. A new count is the trigger for an inspection. | IEC 62561-6 |
| Earth enhancing compounds | The compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it. | IEC 62561-7 |
| Surge protective devices | Part 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants. | IEC 61643-11, IEC 61643-21, IEC 61643-31 |
| PE, bonding and earthing conductors | Sets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame. | IEC 60364-5-54, IS 3043:2026, IS 732:2019 |
LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.
What goes into your defence or government site project
Each card opens the product family in the LPES catalogue.









Areas LPES covers in government & military
- Air bases and hangars
- Radar and air defence sites
- ATC and navigation aids
- Communication and relay stations
- Command and operations centres
- Ammunition and fuel storage
- Naval and port facilities
- Government buildings and campuses
Is your defence or government site site ready for an inspection?
Six points an Electrical Inspector or an insurer will ask about.
- Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
- Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
- Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
- Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
- The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
- SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Answer the six points for your site. Nothing is sent anywhere until you ask.
What each person on a defence or government site project asks
When did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?
LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.
Testing & MeasurementLightning to Load
Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.
Calculated. Coordinated. Implemented. Verified.
- AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
- DesignLPS, earthing and SPD design with calculations and drawings
- SpecifyBill of materials with LPES part numbers and data sheets
- SupplyProducts from one source, tested to IEC 62561 and IEC 61643
- ImplementInstallation supervision or turnkey execution
- VerifyContinuity, earth resistance and SPD checks, recorded
- AssurePeriodic inspection, monitoring and AMC
LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.
LPES servicesBuilt and comply to
- CEA Safety Regulations 2023
- IEC 62305-1 to -4
- IEC 62561 series
- IEC 61643-11, -21 and -41
- IEC 60364-5-54
- IS 3043:2026
- CEA Safety Regulations 2023
- Service-specific requirements
- Explosives regulations
The applicable edition and any project or statutory specification are confirmed at the design stage.
Government & Military lightning protection and earthing: frequently asked questions
How is ammunition storage protected against lightning?
Related: Isolated Air-Termination ›
Why do aircraft need static grounding points?
Related: Static Earthing (Ex) ›
Will lightning protection affect radar performance?
Related: Air Terminal Rods ›
How are deployed shelters earthed?
Related: Portable Earthing Sets & Kits ›
Engineering guides from the LPES knowledge hub
- Earthing of installations with higher protective conductor currentHB-ID-536
- Supplementary bonding and installations with increased shock riskHB-ID-533
- Types of protective earthing conductors and their electrical continuityHB-ID-530
- Earthing conductor and protective bonding conductor sizingHB-ID-528
- Main earthing terminal / main earth busbar (MET)HB-ID-529
- Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
- Measurement of earth fault loop impedance
- Continuity resistance measurement
Related industries
- AirportsIndustry page
- PortsIndustry page
- Oil, Gas & HazardousIndustry page
- Network EquipmentIndustry page
More in Defence & Public Sector
- Defence & Public SectorSector overview
- All industriesIndustries overview
Your power is connected. Is your protection?
Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.
Talk to LPES about a coordinated assessment for your defence or government site project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.