Check the number before it goes on the drawing.
Six calculators for the checks a designer makes most often, each using the equation and table from the standard it cites. Change a value and the result updates. For a full design, send us the drawing.
Lightning Risk Assessment
Enter the structure and its location. See the risk and the class of protection it points to.
Assess a structureIEC 61643 · IEC 62305-4SPD Selector
Choose the device type for each board from the system and the lightning protection level.
Select an SPDBOQ · TenderBOQ and Tender Support
Send the BOQ. Receive item codes, datasheets and specification text matched to it.
Get BOQ supportSix checks, live in the page.
Example values are loaded so you can see how each tool works. Replace them with your own.
Rolling sphere between two rods
How far the sphere dips between two air terminals, and what height stays protected beneath it.
IEC 62305-3:2024, Table 2 and Annex D, Eq. D.1
Protection angle radius
The radius protected by a single air terminal at a chosen height, for simple shapes.
IEC 62305-3:2024, Figure 1 and Eq. D.2. Angles are read from the graph and are approximate.
Separation distance
The clearance to keep between a lightning conductor and other metal or electrical parts.
IEC 62305-3:2024, 6.3, Eq. 6 (simplified approach), Tables 11 to 13
Number of down conductors
The minimum number for an attached system from the roof perimeter.
IEC 62305-3:2024, 5.3.3 and Table 5
Protective conductor size
The cross-section a protective or earthing conductor needs to carry the fault current for the clearing time.
IS 3043:2026, 7.3, adiabatic equation and Tables 15 to 19
Maximum earth fault loop impedance
The highest measured loop impedance at which an MCB still disconnects in time.
IS 3043:2026, 7.4 and Table 20, MCBs to IS/IEC 60898-1
These tools support design. They do not replace the licensed standard, a risk assessment, or review by a competent engineer, and a result is not a statement of compliance.
Send the drawing. We return a referenced design basis.
Air termination layout, down conductor schedule, earthing calculation and SPD schedule, each with the clause it follows.