Lightning, earthing and surge protection for warehouses and storage systems
A modern warehouse is a large steel building full of racking, conveyors, automated storage, scanners and a WMS network that runs every order. Many also carry rooftop solar and a cold store. LPES protects the building and its roof, bonds racking and conveyors for safety and static, and protects ASRS, sortation, dock systems and the network against surges.

Storage Equipment
Roof, skylights and rooftop solar
- Threat
- Steel portal frame roof with skylights, smoke vents, HVAC units and solar arrays.
- LPES measure
- Metal roof sheets used as natural air termination where they qualify, air terminals over roof equipment and PV arrays, and down conductors through the steel columns.
- Families
Lightning, earthing and surge risks on warehouse sites
Large steel roofs
Warehouses and logistics parks have some of the largest roof areas in industry, often with rooftop solar, skylights, smoke vents and HVAC units on top.
Automation that stops everything
ASRS cranes, shuttles, sorters and conveyors run on drives, PLCs and sensors linked by a network. A surge on one link can stop the whole outbound flow.
Racking, conveyors and static
Long runs of steel racking and conveyor frames pick up potential and static from belts, stretch film and plastic totes. Unbonded, they shock staff and upset sensors.
Fire load and life safety
Stored goods carry a high fire load. Fire alarm, sprinkler pumps and smoke ventilation must stay working through a storm.
One coordinated lightning protection, earthing and surge protection system
Four pillars. Connected protection. Clear accountability.
Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

Lightning protection
The building and roof are assessed on lightning risk, area and contents. The steel roof and portal frame serve as natural components where they qualify, and air termination covers PV arrays, HVAC units and roof equipment.

Power protection
Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

Earthing protection
One earthing system for the whole building, based on the foundation earth electrode where the slab allows it. Racking, conveyors, chargers and steel structure are bonded to it, and remote buildings and gatehouses are interconnected.

Surge protection
Protection follows the power and data path to every automated system. Type 1+2 at the main board, Type 2 at conveyor, ASRS and dock boards, Type 3 at PLCs and switches, and DC SPDs on rooftop PV.
Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.
Earthing and PE conductors: what protects people, and what CEA 2023 requires
An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.
On your warehouse site
Conveyor, ASRS and dock motors above 250 V get two separate earth connections. Chargers and drives with high protective conductor current get reinforced PE, and flexible bonds bridge conveyor joints and moving parts.
- Reg 43(v)Every building has protective equipotential bonding that interconnects exposed and extraneous conductive parts.
- Reg 43(ix)Bonding conductors carry the prospective earth-fault current and are tested for effective bonding before energisation.
- Reg 43(xi), (xii)Earth-fault loop impedance is tested so the protective device disconnects in time.
- Reg 43(xiii)The neutral point of every generator and transformer is earthed by not less than two separate connections.
Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.
Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.
LPS class, SPD rating and conductor sizes for warehouse projects
The figures engineers look up most, with the clause behind each. Rows marked in red are specific to warehouse sites.
| Item | Value | Source |
|---|---|---|
| Drives with high PE current (over 10 mA) | PE of at least 10 mm² copper, or a second PE | IS 3043:2026, 7.6 |
| Racking rows | Bonded at both ends and at intervals to the building earth | IEC 60364-5-54 · IS 3043:2026 |
| PV DC SPD, array bonded to the LPS | Type 1 DC SPD and a bond to the LPS | IEC 62305-4:2024, Annex F |
| Steel frame or rebar as down conductor | Overall continuity 0.2 Ω or less, measured four-wire at about 10 A | IEC 62305-3:2024, D.5.3.5 |
| Rolling sphere radius | 20 / 30 / 45 / 60 m for LPS Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Air-termination mesh | 5 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Down-conductor spacing | 10 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 5 |
| LPS conductor, minimum | 50 mm² in copper, aluminium, galvanised or stainless steel | IEC 62305-3:2024, Table 7 |
| Lightning earth | Ring electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 Ω | IEC 62305-3:2024, 5.4 |
| Entrance SPD where an LPS exists | Type 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IV | IEC 62305-4:2024, Table C.3 |
| SPD connecting leads | 0.5 m total or less, line to SPD to earth bar | IEC 62305-4:2024, Annex C |
| Second SPD | Needed when equipment is more than 10 m from the entrance SPD | IEC 62305-4:2024, Annex C |
| Bonding bar to earth | 16 mm² copper, 25 mm² aluminium or 50 mm² steel | IEC 62305-3:2024, Table 9 |
| Disconnection time, TN final circuits | 0.4 s at 230 V, 0.2 s above 230 V | IS 3043:2026, Table 1 |
| Loop impedance, measured | Zs ≤ ⅔ × U0 / Ia | IS 3043:2026 and IS 732 |
| PE and bonding continuity | Within the conductor’s own resistance, tested at about 10 A | IS 3043:2026, Annex E |
The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.
Every part of the warehouse protection system has its own test standard
IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.
| Component | What the standard proves | Standard |
|---|---|---|
| Clamps, connectors and bonding parts | Each joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA. | IEC 62561-1 |
| Conductors and earth electrodes | Sets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper. | IEC 62561-2 |
| Isolating spark gaps | Joins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike. | IEC 62561-3 |
| Conductor holders and fixings | Holders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures. | IEC 62561-4 |
| Earth pit housings and electrode seals | Inspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab. | IEC 62561-5 |
| Lightning strike counters | The counter records each strike carried by a down conductor. A new count is the trigger for an inspection. | IEC 62561-6 |
| Earth enhancing compounds | The compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it. | IEC 62561-7 |
| Surge protective devices | Part 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants. | IEC 61643-11, IEC 61643-21, IEC 61643-31 |
| PE, bonding and earthing conductors | Sets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame. | IEC 60364-5-54, IS 3043:2026, IS 732:2019 |
LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.
What goes into your warehouse project
Each card opens the product family in the LPES catalogue.









Areas LPES covers in storage equipment
- Distribution and fulfilment centres
- High-bay and automated storage (ASRS)
- Cold stores and freezer warehouses
- Logistics parks and ICDs
- Racking and mezzanine systems
- Conveyor and sortation systems
- Dock and yard equipment
- Rooftop solar on warehouses
Is your warehouse site ready for an inspection?
Six points an Electrical Inspector or an insurer will ask about.
- Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
- Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
- Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
- Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
- The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
- SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Answer the six points for your site. Nothing is sent anywhere until you ask.
What each person on a warehouse project asks
When did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?
LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.
Testing & MeasurementLightning to Load
Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.
Calculated. Coordinated. Implemented. Verified.
- AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
- DesignLPS, earthing and SPD design with calculations and drawings
- SpecifyBill of materials with LPES part numbers and data sheets
- SupplyProducts from one source, tested to IEC 62561 and IEC 61643
- ImplementInstallation supervision or turnkey execution
- VerifyContinuity, earth resistance and SPD checks, recorded
- AssurePeriodic inspection, monitoring and AMC
LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.
LPES servicesBuilt and comply to
- CEA Safety Regulations 2023
- IEC 62305-1 to -4
- IEC 62561 series
- IEC 61643-11, -21 and -31
- IEC 60364-5-54
- IS 3043:2026
- IS 732:2019
- NBC 2016
- CEA Safety Regulations 2023
The applicable edition and any project or statutory specification are confirmed at the design stage.
Storage Equipment lightning protection and earthing: frequently asked questions
Does warehouse racking need to be earthed?
Related: Bonding Clamps & Leads ›
Can the warehouse roof act as the lightning protection?
Related: Air Terminal Rods ›
Why do conveyor sensors fail without a clear cause?
Related: Static Earthing (Ex) ›
Does rooftop solar change the protection?
Related: PV Type 1+2 DC SPDs ›
Engineering guides from the LPES knowledge hub
- Earthing of installations with higher protective conductor currentHB-ID-536
- Supplementary bonding and installations with increased shock riskHB-ID-533
- Types of protective earthing conductors and their electrical continuityHB-ID-530
- Earthing conductor and protective bonding conductor sizingHB-ID-528
- Main earthing terminal / main earth busbar (MET)HB-ID-529
- Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
- Measurement of earth fault loop impedance
- Continuity resistance measurement
Related industries
- PortsIndustry page
- FMCG & BeveragesIndustry page
- Real Estate & InfrastructureIndustry page
- RailwaysIndustry page
More in Infrastructure & Logistics
- Infrastructure & LogisticsSector overview
- AirportsIndustry page
- PortsIndustry page
- RailwaysIndustry page
- Water & WastewaterIndustry page
- All industriesIndustries overview
Your power is connected. Is your protection?
Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.
Talk to LPES about a coordinated assessment for your warehouse project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.

