LPES International
LPES International
Protection to Perfection
Currency
0
0
Industries Hospital

Lightning, earthing and surge protection for hospitals and healthcare facilities

A hospital cannot switch off. Patients on ventilators, monitors and infusion pumps depend on power and earth references that stay safe through every storm and every changeover to DG. LPES protects the building, helipad and roof plant, designs earthing to the medical location rules for OTs and ICUs, bonds medical gas and imaging, and protects life-support, imaging and hospital networks against surges.

Request a coordinated assessment
Group 0 · 1 · 2medical locations classified by how close the equipment is to the patient, each with its own earthing and supply rules
0.5 smaximum changeover for safety services in group 2 locations, so the earth reference must stay stable through every transfer
1 Passportdrawings, test records and inspection plan in a single LPES Protection Passport
The riskA hospital cannot switch off, and patients connected to equipment need earth references that stay safe through every storm and changeover.
The LPES answerLPES protects the roof, helipad and oxygen storage, designs OT and ICU earthing to IEC 60364-7-710, and protects life support, imaging and networks with SPDs.
The ruleEvery group 2 bond is measured, not assumed.
Multi-specialty hospital with main block, emergency entrance and ambulances, OPD and diagnostics wing, rooftop helipad, chillers, medical oxygen tanks and pipelines, DG sets, substation and transformers, marked with LPES protection points
LPES protection map
Hospital
Lightning protectionEarthing & bondingSurge protectionSelect a point to see the threat, the LPES measure and the product families.
1Lightning protection

Helipad and roof

Threat
Helipad, its lighting and the rooftop plant on the highest block.
LPES measure
Air termination arranged around the helipad so it stays clear for landing, helipad lighting bonded and protected, and down conductors through the structure.
Families
The problem

Lightning, earthing and surge risks on hospital sites

Patients connected to equipment

In OTs and ICUs, electrodes and catheters connect equipment to the patient. A few volts of touch voltage that a healthy person would never notice can harm them.

Imaging and life support

MRI, CT, cath labs, ventilators and monitors are both expensive and safety-critical. A surge failure cancels procedures and moves patients.

Supply changeovers

Grid failures transfer the hospital to UPS, isolation transformers and DG. Switching surges and earth reference changes reach every ward.

Roof plant, helipad and oxygen

Chillers, AHUs, the helipad and medical oxygen tanks stand in exposed places and must be protected without compromising their function.

The LPES answer

One coordinated lightning protection, earthing and surge protection system

Four pillars. Connected protection. Clear accountability.

Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

LPES L shield

Lightning protection

Blocks, helipad, roof plant and oxygen storage are assessed on lightning risk and on the services they keep running. Structural rebar serves as natural down conductors, and air termination keeps the helipad usable.

LPES P shield

Power protection

Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

LPES E shield

Earthing protection

One earthing system for the campus, with supplementary equipotential bonding in every group 1 and group 2 location, medical IT systems with insulation monitoring in group 2, and measured bonding resistance in every room.

LPES S shield

Surge protection

Protection follows the supply from the incomer through UPS and isolation transformers to the bedside. Type 1+2 at the main board, Type 2 at department and imaging boards, Type 3 at critical equipment and data SPDs on HIS, PACS and nurse call.

Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.

Protective conductors

Earthing and PE conductors: what protects people, and what CEA 2023 requires

An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.

Transformersource neutralMain earthing terminalEquipment framemotor, panel, skidSteel, pipes, traysEarth grid and electrodes12345Drag to rotate
Auto tour · select any point to stop
Conductor 3 of 5

Protective earthing (PE) conductor

Main earthing terminal to the frame of every piece of equipment

In a hospital. Chillers, AHUs and pumps run around the clock. A loose or undersized PE leaves the frame live after a fault.

Rule
CEA Reg 43(vii): two separate and distinct connections for apparatus above 250 V. Reg 43(ix): carries the prospective earth-fault current.
Limit
Earth-fault loop impedance: measured Zs ≤ ⅔ × U0 / Ia, so the device disconnects in 0.4 s at 230 V and 0.2 s above 230 V on TN final circuits.
Sizing
IS 3043:2026, Table 12, same material as the line conductor S: equal to S up to 16 mm², 16 mm² for S from 16 to 35 mm², S/2 above 35 mm². Or by the adiabatic equation S = √(I²t) / k.
Material
Insulated green-yellow copper cable, copper tape or copper-bonded conductor, with crimped lugs at both ends. No soldered joints and no switch in the PE.
Families

On your hospital site

Chillers, AHUs, pumps and imaging equipment above 250 V get two separate earth connections. In group 2 locations every PE and bonding conductor is tested to the local bar, and isolation transformer frames are earthed as the medical IT system requires.

  • Reg 43(v)Every building has protective equipotential bonding that interconnects exposed and extraneous conductive parts.
  • Reg 43(ix)Bonding conductors carry the prospective earth-fault current and are tested for effective bonding before energisation.
  • Reg 43(xi), (xii)Earth-fault loop impedance is tested so the protective device disconnects in time.
  • Reg 43(xiii)The neutral point of every generator and transformer is earthed by not less than two separate connections.

Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.

Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.

Want this checked against your plant?Send the single line diagram and layout. An LPES engineer reviews earthing, PE conductors and lightning protection against CEA 2023 and IS 3043:2026.
Call 080 4388 8915WhatsApp
Design values

LPS class, SPD rating and conductor sizes for hospital projects

The figures engineers look up most, with the clause behind each. Rows marked in red are specific to hospital sites.

ItemValueSource
Group 2 medical locationsMedical IT system with insulation monitoring, and 0.2 Ω or less between socket PE and the bonding barIEC 60364-7-710
Panel PE terminal to any exposed part0.1 Ω or less, tested at 10 A or moreIS 3043:2026, 7.1
Separate “instrument” earth pitsNot permitted. One interconnected earthing networkIS 3043:2026, 6.3
Drives with high PE current (over 10 mA)PE of at least 10 mm² copper, or a second PEIS 3043:2026, 7.6
Rolling sphere radius20 / 30 / 45 / 60 m for LPS Class I / II / III / IVIEC 62305-3:2024, Table 2
Air-termination mesh5 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 2
Down-conductor spacing10 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 5
LPS conductor, minimum50 mm² in copper, aluminium, galvanised or stainless steelIEC 62305-3:2024, Table 7
Lightning earthRing electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 ΩIEC 62305-3:2024, 5.4
Entrance SPD where an LPS existsType 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IVIEC 62305-4:2024, Table C.3
SPD connecting leads0.5 m total or less, line to SPD to earth barIEC 62305-4:2024, Annex C
Second SPDNeeded when equipment is more than 10 m from the entrance SPDIEC 62305-4:2024, Annex C
Bonding bar to earth16 mm² copper, 25 mm² aluminium or 50 mm² steelIEC 62305-3:2024, Table 9
Disconnection time, TN final circuits0.4 s at 230 V, 0.2 s above 230 VIS 3043:2026, Table 1
Loop impedance, measuredZs ≤ ⅔ × U0 / IaIS 3043:2026 and IS 732
PE and bonding continuityWithin the conductor’s own resistance, tested at about 10 AIS 3043:2026, Annex E

The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.

Component standards

Every part of the hospital protection system has its own test standard

IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.

ComponentWhat the standard provesStandard
Clamps, connectors and bonding partsEach joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA.IEC 62561-1
Conductors and earth electrodesSets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper.IEC 62561-2
Isolating spark gapsJoins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike.IEC 62561-3
Conductor holders and fixingsHolders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures.IEC 62561-4
Earth pit housings and electrode sealsInspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab.IEC 62561-5
Lightning strike countersThe counter records each strike carried by a down conductor. A new count is the trigger for an inspection.IEC 62561-6
Earth enhancing compoundsThe compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it.IEC 62561-7
Surge protective devicesPart 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants.IEC 61643-11, IEC 61643-21, IEC 61643-31
PE, bonding and earthing conductorsSets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame.IEC 60364-5-54, IS 3043:2026, IS 732:2019

LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.

Need the bill of material for your hospital project?Share the drawings and LPES returns a specified, priced list across lightning protection, earthing and surge protection.
Call 080 4388 8915WhatsApp
From the LPES range

What goes into your hospital project

Each card opens the product family in the LPES catalogue.

LPES Earthing strips, tapes and cables
Earthing strips, tapes and cablesPE, bonding and earthing conductors in copper, copper-bonded and galvanised steelView family ›
LPES Copper-bonded round conductor
Copper-bonded round conductorCoils for down conductors, ring earths and bonding runsView family ›
LPES Galvanised flat conductor
Galvanised flat conductorHot-dip galvanised strip for grids and structure bondingView family ›
LPES Bridging braids and flexible links
Bridging braids and flexible linksBonds across joints, doors, trays and moving partsView family ›
LPES Earth bars and terminals
Earth bars and terminalsMain earthing terminals and local bonding barsView family ›
LPES Clamps and connectors
Clamps and connectorsJoints for round and flat conductors, built and comply to IEC 62561-1View family ›
LPES Conductor holders
Conductor holdersRoof, wall and structure fixings for LPS conductorsView family ›
LPES Earth electrodes, pits and backfill
Earth electrodes, pits and backfillRods, enhancement compound, pit chambers and test platesView family ›
LPES Surge protective devices
Surge protective devicesType 1+2, Type 2 and Type 3 for AC, DC, PV and signal linesView family ›
Scope

Areas LPES covers in hospital

  • Operation theatres and ICUs
  • Emergency and trauma
  • Imaging, MRI and cath labs
  • Wards and patient rooms
  • Medical gases and oxygen
  • Labs and blood banks
  • Helipads and roof plant
  • UPS, DG and substations
Two-minute check

Is your hospital site ready for an inspection?

Six points an Electrical Inspector or an insurer will ask about.

  1. Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
  2. Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
  3. Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
  4. Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
  5. The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
  6. SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Your result
0 of 6 in place

Answer the six points for your site. Nothing is sent anywhere until you ask.

By role

What each person on a hospital project asks

Plant electrical headWhen did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?

LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.

Testing & Measurement
How we work

Lightning to Load

Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.

Calculated. Coordinated. Implemented. Verified.

  1. AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
  2. DesignLPS, earthing and SPD design with calculations and drawings
  3. SpecifyBill of materials with LPES part numbers and data sheets
  4. SupplyProducts from one source, tested to IEC 62561 and IEC 61643
  5. ImplementInstallation supervision or turnkey execution
  6. VerifyContinuity, earth resistance and SPD checks, recorded
  7. AssurePeriodic inspection, monitoring and AMC

LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.

LPES services
Standards

Built and comply to

  • CEA Safety Regulations 2023
  • IEC 60364-7-710
  • IEC 62305-1 to -4
  • IEC 61643-11 and -21
  • IEC 62561 series
  • IEC 60364-5-54
  • IS 3043:2026
  • NBC 2016
  • CEA Safety Regulations 2023

The applicable edition and any project or statutory specification are confirmed at the design stage.

Questions engineers ask

Hospital lightning protection and earthing: frequently asked questions

What makes OT and ICU earthing different?
Group 2 locations use a medical IT system with insulation monitoring so a first fault does not interrupt supply, and every exposed and extraneous conductive part is bonded to a local bar with 0.2 Ω or less between them.
Related: Earth Bars & Terminals ›
Can SPDs be used on medical IT supplies?
Yes, with SPDs chosen and connected so they do not create leakage that defeats the insulation monitoring. Placement is coordinated with the isolation transformer and the IMD.
Related: Type 3 SPDs (DIN rail) ›
Does the helipad need lightning protection?
It sits on the highest roof. Air terminals are placed around it, not on it, so the landing area stays clear, and helipad lighting and windsock supplies get SPDs.
Related: Air Terminal Rods ›
Should medical oxygen tanks be bonded?
Yes. Tanks, vaporisers and manifolds are bonded to the site earth and gas pipelines are bonded where they enter each building, so no spark can occur between metal parts.
Related: Bonding Clamps & Leads ›

Engineering guides from the LPES knowledge hub

  • Earthing of installations with higher protective conductor currentHB-ID-536
  • Supplementary bonding and installations with increased shock riskHB-ID-533
  • Types of protective earthing conductors and their electrical continuityHB-ID-530
  • Earthing conductor and protective bonding conductor sizingHB-ID-528
  • Main earthing terminal / main earth busbar (MET)HB-ID-529
  • Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
  • Measurement of earth fault loop impedance
  • Continuity resistance measurement

Related industries

More in Healthcare & Life Sciences

Still deciding where to start?Most hospital sites start with a risk assessment and an earthing audit. Talk to an LPES engineer today.
Call 080 4388 8915WhatsApp

Your power is connected. Is your protection?

Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.

Talk to LPES about a coordinated assessment for your hospital project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.

WhatsAppMessage LPES
OfficesBudapest, Hungary, Europe · Gurugram, India
Takes 20 seconds

Get a call back from an LPES engineer

Name and number. That is all. No drawings, GST details or part numbers needed now.

Add details, optional

An LPES engineer calls you within one working day. Your details go to LPES only. Prefer to talk now? 080 4388 8915

Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.