Earthing, lightning and surge protection for substations and transmission
A substation has to stay safe for the person standing next to it during the worst fault, and keep its protection working through every storm. That depends on an earth mat designed on touch and step voltage, a switchyard shielded from direct strikes, and relays and communications protected from surges. LPES designs, supplies and tests all three as one system.

Substations & T&D
Transmission towers and shield wires
- Threat
- Direct strikes to incoming line towers, with surges travelling along the line into the yard.
- LPES measure
- Overhead earth wires continued over the yard, tower footings earthed, and line surge arresters at the line entry coordinated with the yard insulation.
- Families
Lightning, earthing and surge risks on substation sites
Touch and step voltage during a fault
When an earth fault flows into the mat, the ground around equipment, structures and the fence rises in potential. A person touching a structure or walking across the yard can be exposed to a dangerous voltage.
Transferred potential
Fences, cable screens, pipes and rails can carry the yard potential outside the substation, to a point where nobody expects it.
Direct strikes to the switchyard
Gantries, busbars and transformers are tall, metallic and exposed. A direct strike to an unshielded bay can flash over insulation and trip the station.
Relays and SCADA on long control cables
Protection relays, IEC 61850 networks, battery chargers and RTUs sit at the end of control cables that run across the yard and pick up induced surges.
One coordinated lightning protection, earthing and surge protection system
Four pillars. Connected protection. Clear accountability.
Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

Lightning protection
The switchyard is shielded by earth wires and lightning masts placed so that every bay lies inside the protected zone. The control building gets its own LPS, and every mast, gantry and tower footing is bonded into the earth mat.

Power protection
Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

Earthing protection
The earth mat is designed on touch, step and transferred voltage using measured soil resistivity, fault current and clearing time. Equipment risers are welded, neutrals have two connections, and the design is verified by measurement after construction.

Surge protection
Surge arresters protect the transformers and lines. Inside the control building, Type 1+2 SPDs on the station service board, Type 3 and DC SPDs on relays, SCADA and the battery system, and data-line SPDs on copper communication links.
Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.
Earthing and PE conductors: what protects people, and what CEA 2023 requires
An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.
On your substation site
Every structure, equipment base and panel is connected to the mat by risers sized for the fault current, with two connections at transformers and neutral points. Joints below ground are exothermic welded, and bolted joints are kept accessible for testing.
- Reg 43(vii)Frames of motors and control apparatus above 250 V are earthed by two separate and distinct connections.
- Reg 50(2)Generator and transformer neutrals above 650 V are earthed by not less than two separate connections.
- Reg 50(1)Substation earthing limits touch potential, step potential and earth potential rise.
- Reg 50(8)Earth resistance is tested on a dry day at least once a year and the record is kept.
Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.
Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.
LPS class, SPD rating and conductor sizes for substation projects
The figures engineers look up most, with the clause behind each. Rows marked in red are specific to substation sites.
| Item | Value | Source |
|---|---|---|
| Substation earth grid | Designed on touch and step voltage, not on a resistance figure | IS 3043:2026, cl. 10 · IEEE 80 |
| Earth-enhancing compound | Only above 3000 Ω·m and only for the lightning earth | IS 3043:2026, 8.1.7 |
| Links between buildings | Metal-free fibre, or bonded metal ducts with SPDs at both ends | IEC 62305-4:2024, Annex B |
| Steel frame or rebar as down conductor | Overall continuity 0.2 Ω or less, measured four-wire at about 10 A | IEC 62305-3:2024, D.5.3.5 |
| Rolling sphere radius | 20 / 30 / 45 / 60 m for LPS Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Air-termination mesh | 5 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Down-conductor spacing | 10 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 5 |
| LPS conductor, minimum | 50 mm² in copper, aluminium, galvanised or stainless steel | IEC 62305-3:2024, Table 7 |
| Lightning earth | Ring electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 Ω | IEC 62305-3:2024, 5.4 |
| Entrance SPD where an LPS exists | Type 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IV | IEC 62305-4:2024, Table C.3 |
| SPD connecting leads | 0.5 m total or less, line to SPD to earth bar | IEC 62305-4:2024, Annex C |
| Second SPD | Needed when equipment is more than 10 m from the entrance SPD | IEC 62305-4:2024, Annex C |
| Bonding bar to earth | 16 mm² copper, 25 mm² aluminium or 50 mm² steel | IEC 62305-3:2024, Table 9 |
| Disconnection time, TN final circuits | 0.4 s at 230 V, 0.2 s above 230 V | IS 3043:2026, Table 1 |
| Loop impedance, measured | Zs ≤ ⅔ × U0 / Ia | IS 3043:2026 and IS 732 |
| PE and bonding continuity | Within the conductor’s own resistance, tested at about 10 A | IS 3043:2026, Annex E |
The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.
Every part of the substation protection system has its own test standard
IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.
| Component | What the standard proves | Standard |
|---|---|---|
| Clamps, connectors and bonding parts | Each joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA. | IEC 62561-1 |
| Conductors and earth electrodes | Sets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper. | IEC 62561-2 |
| Isolating spark gaps | Joins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike. | IEC 62561-3 |
| Conductor holders and fixings | Holders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures. | IEC 62561-4 |
| Earth pit housings and electrode seals | Inspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab. | IEC 62561-5 |
| Lightning strike counters | The counter records each strike carried by a down conductor. A new count is the trigger for an inspection. | IEC 62561-6 |
| Earth enhancing compounds | The compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it. | IEC 62561-7 |
| Surge protective devices | Part 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants. | IEC 61643-11, IEC 61643-21, IEC 61643-31 |
| PE, bonding and earthing conductors | Sets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame. | IEC 60364-5-54, IS 3043:2026, IS 732:2019 |
LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.
What goes into your substation project
Each card opens the product family in the LPES catalogue.









Areas LPES covers in substations & t&d
- EHV and HV switchyards
- 33 kV and 11 kV distribution substations
- Gas insulated substations
- Transmission and distribution lines
- Pooling substations for solar and wind
- Industrial plant receiving substations
- Control, relay and battery rooms
- SCADA, RTU and communication systems
Is your substation site ready for an inspection?
Six points an Electrical Inspector or an insurer will ask about.
- Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
- Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
- Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
- Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
- The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
- SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Answer the six points for your site. Nothing is sent anywhere until you ask.
What each person on a substation project asks
When did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?
LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.
Testing & MeasurementLightning to Load
Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.
Calculated. Coordinated. Implemented. Verified.
- AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
- DesignLPS, earthing and SPD design with calculations and drawings
- SpecifyBill of materials with LPES part numbers and data sheets
- SupplyProducts from one source, tested to IEC 62561 and IEC 61643
- ImplementInstallation supervision or turnkey execution
- VerifyContinuity, earth resistance and SPD checks, recorded
- AssurePeriodic inspection, monitoring and AMC
LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.
LPES servicesBuilt and comply to
- CEA Safety Regulations 2023
- IEEE 80
- IEC 61936-1
- IEC 62305-1 to -4
- IEC 62561 series
- IEC 61643-11 and -21
- IEC 60099-4
- IS 3043:2026
- CEA Safety Regulations 2023
The applicable edition and any project or statutory specification are confirmed at the design stage.
Substations & T&D lightning protection and earthing: frequently asked questions
Why is 1 ohm not enough to call a substation safe?
Related: Earth Mats & Grids ›
What does an earth mat design need from the client?
Related: Design & Engineering ›
How is the switchyard protected from direct strikes?
Related: Air Termination ›
Do relays and SCADA need SPDs if the yard is shielded?
Related: Data, Signal & RF Line SPDs ›
Engineering guides from the LPES knowledge hub
- Earthing of installations with higher protective conductor currentHB-ID-536
- Supplementary bonding and installations with increased shock riskHB-ID-533
- Types of protective earthing conductors and their electrical continuityHB-ID-530
- Earthing conductor and protective bonding conductor sizingHB-ID-528
- Main earthing terminal / main earth busbar (MET)HB-ID-529
- Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
- Measurement of earth fault loop impedance
- Continuity resistance measurement
Related industries
- Power IndustryIndustry page
- Renewable EnergyIndustry page
- RailwaysIndustry page
- EV InfrastructureIndustry page
More in Energy & Power
- Energy & PowerSector overview
- Power IndustryIndustry page
- Renewable EnergyIndustry page
- EV InfrastructureIndustry page
- All industriesIndustries overview
Your power is connected. Is your protection?
Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.
Talk to LPES about a coordinated assessment for your substation project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.