LPES International
LPES International
Protection to Perfection
Currency
0
0

Lightning, earthing and surge protection for cement plants

A cement plant puts its tallest steel on the highest ground in the district and connects it to a quarry by kilometres of conveyor. LPES protects the preheater tower, the kiln line drives and the quarry in one design, from the limestone face to the packing plant.

Request a coordinated assessment
100 m +preheater towers and stacks, where strikes to the side of the structure must be designed for above 60 m
km-scaleoverland conveyors that carry potential between quarry, crusher and plant
24 × 7kiln operation, where an unplanned stop costs fuel, refractory life and production
The riskA cement plant has the tallest structures in its area and kilometres of conveyor linking quarry and plant.
The LPES answerLPES uses the steel and concrete structures as natural components, interconnects every area grid and protects drives and DCS loops with SPDs.
The ruleThe quarry gets a lightning warning system tied to the blasting stop-work procedure.
Cement plant with quarry, crusher, conveyors, preheater tower, rotary kiln, mills, silos and dispatch area, marked with LPES protection points
LPES protection map
Cement
Lightning protectionEarthing & bondingSurge protectionSelect a point to see the threat, the LPES measure and the product families.
1Lightning protection

Preheater tower

Threat
The highest structure on site. Top and side strikes reach platforms, lighting and instruments.
LPES measure
The steel structure is used as the natural down conductor, with air terminals at the top level and bonding of handrails and platforms. The upper part is protected against side flashes. Aviation obstruction lights have their own SPDs.
Families
The problem

Lightning, earthing and surge risks on cement sites

The tallest target for kilometres

Preheater tower, stacks and silos attract strikes many times a year. Platforms, lighting, analysers and instruments on the tower take the current if nothing else does.

Drives and DCS that stop the kiln

MV drives on the kiln, mills and fans, weigh feeders and gas analysers are tied together by long cable routes. One damaged I/O card can stop the line.

Blasting in the quarry

Electric detonators and an approaching thunderstorm do not mix. The quarry needs enough warning to stop charging and clear the face.

Coal mill and fuel handling

Coal and petcoke dust in mills, bag filters and silos is ignitable. Unbonded filter cages and ducts build static charge.

The LPES answer

One coordinated lightning protection, earthing and surge protection system

Four pillars. Connected protection. Clear accountability.

Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

LPES L shield

Lightning protection

Tall steel and concrete structures are used as natural components wherever continuity can be proven, which keeps the design economical. Air terminals, bonding of platforms and side-flash protection are added where the structure needs them, and the quarry gets storm warning.

LPES P shield

Power protection

Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

LPES E shield

Earthing protection

Each area has its own grid: crusher, raw mill, kiln, cement mill, packing and substations. All are interconnected through conveyor structures and buried conductors, so there is one earth across the plant. In rock, ring and foundation electrodes do the work. Enhancement compound is used only where resistivity is very high and only for the lightning earth, as IS 3043:2026 requires.

LPES S shield

Surge protection

Surge protection follows the cable routes between load centres. Power SPDs at each substation and MCC, and signal SPDs at both ends of every loop that runs between buildings.

Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.

Protective conductors

Earthing and PE conductors: what protects people, and what CEA 2023 requires

An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material.

Preheater towerRotary kiln and driveCement silosSubstationMain earthing terminalConveyorEarth grid in limestone ground12345Drag to rotate
Auto tour · select any conductor to stop
Conductor 3 of 5

Protective earthing (PE) conductor

Main earthing terminal to the frame of every piece of equipment

On a cement plant. The kiln main drive runs 24 × 7. A loose or undersized PE leaves the motor frame live after a fault.

Rule
CEA Reg 43(vii): two separate and distinct connections for apparatus above 250 V. Reg 43(ix): carries the prospective earth-fault current.
Limit
Earth-fault loop impedance: measured Zs ≤ ⅔ × U0 / Ia, so the device disconnects in 0.4 s at 230 V and 0.2 s above 230 V on TN final circuits.
Sizing
IS 3043:2026, Table 12, same material as the line conductor S: equal to S up to 16 mm², 16 mm² for S from 16 to 35 mm², S/2 above 35 mm². Or by the adiabatic equation S = √(I²t) / k.
Material
Insulated green-yellow copper cable, copper tape or copper-bonded conductor, with crimped lugs at both ends. No soldered joints and no switch in the PE.
Families

On your cement site

MV and LV motors, drive panels and transformers each get two earth connections. Galvanised or copper-bonded strip bonds structures and conveyors, copper is used for drive and control earthing, and flexible braids bridge expansion joints and vibrating equipment.

  • Reg 43(vii)Frames of motors and control apparatus above 250 V are earthed by two separate and distinct connections.
  • Reg 50(2)Generator and transformer neutrals above 650 V are earthed by not less than two separate connections.
  • Reg 50(1)Substation earthing limits touch potential, step potential and earth potential rise.
  • Reg 50(8)Earth resistance is tested on a dry day at least once a year and the record is kept.

Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.

Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.

Want this checked against your plant?Send the single line diagram and layout. An LPES engineer reviews earthing, PE conductors and lightning protection against CEA 2023 and IS 3043:2026.
Call 080 4388 8915WhatsApp
Design values

LPS class, SPD rating and conductor sizes for cement projects

The figures engineers look up most, with the clause behind each. Rows marked in red are specific to cement sites.

ItemValueSource
Structures above 60 mProtect the top 20 % of the height against side flashesIEC 62305-3:2024, 5.2.3
Steel frame or rebar as down conductorOverall continuity 0.2 Ω or less, measured four-wire at about 10 AIEC 62305-3:2024, D.5.3.5
Earth-enhancing compoundOnly above 3000 Ω·m and only for the lightning earthIS 3043:2026, 8.1.7
Substation earth gridDesigned on touch and step voltage, not on a resistance figureIS 3043:2026, cl. 10 · IEEE 80
Rolling sphere radius20 / 30 / 45 / 60 m for LPS Class I / II / III / IVIEC 62305-3:2024, Table 2
Air-termination mesh5 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 2
Down-conductor spacing10 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 5
LPS conductor, minimum50 mm² in copper, aluminium, galvanised or stainless steelIEC 62305-3:2024, Table 7
Lightning earthRing electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 ΩIEC 62305-3:2024, 5.4
Entrance SPD where an LPS existsType 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IVIEC 62305-4:2024, Table C.3
SPD connecting leads0.5 m total or less, line to SPD to earth barIEC 62305-4:2024, Annex C
Second SPDNeeded when equipment is more than 10 m from the entrance SPDIEC 62305-4:2024, Annex C
Bonding bar to earth16 mm² copper, 25 mm² aluminium or 50 mm² steelIEC 62305-3:2024, Table 9
Disconnection time, TN final circuits0.4 s at 230 V, 0.2 s above 230 VIS 3043:2026, Table 1
Loop impedance, measuredZs ≤ ⅔ × U0 / IaIS 3043:2026 and IS 732
PE and bonding continuityWithin the conductor’s own resistance, tested at about 10 AIS 3043:2026, Annex E

The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.

Component standards

Every part of the cement protection system has its own test standard

IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.

ComponentWhat the standard provesStandard
Clamps, connectors and bonding partsEach joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA.IEC 62561-1
Conductors and earth electrodesSets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper.IEC 62561-2
Isolating spark gapsJoins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike.IEC 62561-3
Conductor holders and fixingsHolders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures.IEC 62561-4
Earth pit housings and electrode sealsInspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab.IEC 62561-5
Lightning strike countersThe counter records each strike carried by a down conductor. A new count is the trigger for an inspection.IEC 62561-6
Earth enhancing compoundsThe compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it.IEC 62561-7
Surge protective devicesPart 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants.IEC 61643-11, IEC 61643-21, IEC 61643-31
PE, bonding and earthing conductorsSets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame.IEC 60364-5-54, IS 3043:2026, IS 732:2019

LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.

Need the bill of material for your cement project?Share the drawings and LPES returns a specified, priced list across lightning protection, earthing and surge protection.
Call 080 4388 8915WhatsApp
From the LPES range

What goes into your cement project

Each card opens the product family in the LPES catalogue.

LPES Earthing strips, tapes and cables
Earthing strips, tapes and cablesPE, bonding and earthing conductors in copper, copper-bonded and galvanised steelView family ›
LPES Copper-bonded round conductor
Copper-bonded round conductorCoils for down conductors, ring earths and bonding runsView family ›
LPES Galvanised flat conductor
Galvanised flat conductorHot-dip galvanised strip for grids and structure bondingView family ›
LPES Bridging braids and flexible links
Bridging braids and flexible linksBonds across joints, doors, trays and moving partsView family ›
LPES Earth bars and terminals
Earth bars and terminalsMain earthing terminals and local bonding barsView family ›
LPES Clamps and connectors
Clamps and connectorsJoints for round and flat conductors, built and comply to IEC 62561-1View family ›
LPES Conductor holders
Conductor holdersRoof, wall and structure fixings for LPS conductorsView family ›
LPES Earth electrodes, pits and backfill
Earth electrodes, pits and backfillRods, enhancement compound, pit chambers and test platesView family ›
LPES Surge protective devices
Surge protective devicesType 1+2, Type 2 and Type 3 for AC, DC, PV and signal linesView family ›
Scope

Areas LPES covers in cement

  • Limestone quarry and crusher
  • Stacker, reclaimer and conveyors
  • Raw mill and coal mill
  • Preheater, kiln and cooler
  • Cement mills and silos
  • Packing plant and dispatch
  • Waste heat recovery and captive power
  • Substations, MCC rooms and CCR
Two-minute check

Is your cement site ready for an inspection?

Six points an Electrical Inspector or an insurer will ask about.

  1. Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
  2. Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
  3. Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
  4. Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
  5. The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
  6. SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Your result
0 of 6 in place

Answer the six points for your site. Nothing is sent anywhere until you ask.

By role

What each person on a cement project asks

Plant electrical headWhen did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?

LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.

Testing & Measurement
How we work

Lightning to Load

Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.

Calculated. Coordinated. Implemented. Verified.

  1. AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
  2. DesignLPS, earthing and SPD design with calculations and drawings
  3. SpecifyBill of materials with LPES part numbers and data sheets
  4. SupplyProducts from one source, tested to IEC 62561 and IEC 61643
  5. ImplementInstallation supervision or turnkey execution
  6. VerifyContinuity, earth resistance and SPD checks, recorded
  7. AssurePeriodic inspection, monitoring and AMC

LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.

LPES services
Standards

Built and comply to

  • CEA Safety Regulations 2023
  • IEC 62305-1 to -4
  • IEC 62561 series
  • IEC 61643-11 and -21
  • IS 3043:2026
  • IEEE 80
  • CEA Regulations 2023
  • IS 732

The applicable edition and any project or statutory specification are confirmed at the design stage.

Questions engineers ask

Cement lightning protection and earthing: frequently asked questions

Can the preheater tower steel be used as the down conductor?
Yes. IEC 62305-3 allows structural steel to be used as a natural down conductor when it is electrically continuous and has adequate cross-section. Continuity is tested and recorded, and the base is connected to the earth grid at several points.
Related: Clamps — Air-Termination Joints ›
Why do instruments still fail when the plant has lightning protection?
An external LPS protects the structure. Instruments fail from surges induced in long cables or from potential differences between buildings. That is solved with equipotential bonding and SPDs on power and signal lines at both ends.
Related: Signal & Data SPDs ›
How do we manage lightning risk during quarry blasting?
With a lightning detection and warning system that alarms when a storm is approaching, linked to a written stop-work procedure. It gives the blasting crew time to stop charging and move clear.
Related: Lightning Detection & Warning ›

Engineering guides from the LPES knowledge hub

  • Concrete-embedded foundation earth electrodesHB-ID-366
  • Design of a substation earthing system, step by stepHB-ID-373
  • Types of protective earthing conductors and their electrical continuityHB-ID-530
  • Earthing conductor and protective bonding conductor sizingHB-ID-528
  • Main earthing terminal / main earth busbar (MET)HB-ID-529
  • Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
  • Measurement of earth fault loop impedance
  • Continuity resistance measurement

Related industries

Sector

  • Process & Heavy IndustrySector hub
  • All industries/industries
Still deciding where to start?Most cement sites start with a risk assessment and an earthing audit. Talk to an LPES engineer today.
Call 080 4388 8915WhatsApp

Your power is connected. Is your protection?

Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.

Talk to LPES about a coordinated assessment for your cement project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.

WhatsAppMessage LPES
OfficesBudapest, Hungary, Europe · Gurugram, India
Takes 20 seconds

Get a call back from an LPES engineer

Name and number. That is all. No drawings, GST details or part numbers needed now.

Add details, optional

An LPES engineer calls you within one working day. Your details go to LPES only. Prefer to talk now? 080 4388 8915

Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.