LPES International
LPES International
Protection to Perfection
Currency
0
0
Industries Power Industry

Lightning, earthing and surge protection for power plants

A power station is built around the tallest chimney, the largest boilers and the highest fault levels in its region. A strike or a surge that trips a unit costs megawatt-hours, grid penalties and a restart that takes hours. LPES protects the structures, the plant and switchyard earthing, and the control and protection systems as one coordinated system.

Request a coordinated assessment
18 kV · 6.6 kV · 415 V · 220 V DCgenerator, auxiliary, LT and DC systems all sit on one interconnected earthing system
DCS · Protection · Teleprotectionsignal, network and communication lines are protected alongside power, because a false trip starts there
1 Passportdrawings, test records and inspection plan in a single LPES Protection Passport
The riskA power plant has the tallest chimney and the highest fault levels in its region, and a single surge can trip a unit.
The LPES answerLPES protects chimneys, boilers and cooling towers, designs one interconnected earthing system with the switchyard and protects DCS and protection systems with coordinated SPDs.
The ruleThe switchyard is designed on touch and step voltage, and every reading is recorded against its limit.
Thermal power station with chimney, boiler house, cooling towers, turbine hall, coal yard with stacker-reclaimer, conveyors, switchyard and water treatment, marked with LPES protection points
LPES protection map
Power Industry
Lightning protectionEarthing & bondingSurge protectionSelect a point to see the threat, the LPES measure and the product families.
1Lightning protection

Chimney and stacks

Threat
Direct strikes to the chimney top and side flashes down its height.
LPES measure
Air termination ring and down conductors on the chimney shell, bonded to the reinforcement at intervals, and a test joint for each conductor at the base. Aviation lights get their own SPDs.
Families
The problem

Lightning, earthing and surge risks on power plant sites

A unit trip on a single surge

The DCS, turbine controls and protection relays decide whether a unit stays on load. A surge on one input card or a communication link can trip the unit and start a hot restart.

The tallest structures for kilometres

Chimneys above 200 m, boiler structures and natural draught cooling towers are struck regularly. Above 60 m, flashes also hit the side of the structure.

Very high fault levels

Generator transformers and the switchyard carry fault currents that raise the potential of the whole site. Touch, step and transferred voltages have to be designed and tested.

Coal, hydrogen and oil

Coal dust in mills and bunkers, hydrogen in generator cooling and fuel oil in tank farms are ignition hazards that lightning and static must not reach.

The LPES answer

One coordinated lightning protection, earthing and surge protection system

Four pillars. Connected protection. Clear accountability.

Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

LPES L shield

Lightning protection

Chimney, boiler house, cooling towers, coal handling plant and switchyard are assessed together. Tall structures are protected against side flashes, structural steel and reinforcement are used as natural components where continuity is proven, and the switchyard is shielded by masts and earth wires.

LPES P shield

Power protection

Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

LPES E shield

Earthing protection

Station earth, switchyard mat, lightning earth and the earthing of electronics form one interconnected system. Generator and transformer neutrals are earthed to their schemes, and the switchyard is designed on touch, step and transferred voltage.

LPES S shield

Surge protection

Protection follows the power and control hierarchy. Type 1+2 at unit and station boards, Type 2 at auxiliary MCCs, Type 3 and signal SPDs at DCS, protection, SCADA and communication equipment. Status contacts report to the DCS.

Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.

Protective conductors

Earthing and PE conductors: what protects people, and what CEA 2023 requires

An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.

Transformersource neutralMain earthing terminalEquipment framemotor, panel, skidSteel, pipes, traysEarth grid and electrodes12345Drag to rotate
Auto tour · select any point to stop
Conductor 3 of 5

Protective earthing (PE) conductor

Main earthing terminal to the frame of every piece of equipment

On a power plant. Boiler feed pumps, ID and FD fans and mills run on large motors. A loose PE leaves a motor frame live after a fault.

Rule
CEA Reg 43(vii): two separate and distinct connections for apparatus above 250 V. Reg 43(ix): carries the prospective earth-fault current.
Limit
Earth-fault loop impedance: measured Zs ≤ ⅔ × U0 / Ia, so the device disconnects in 0.4 s at 230 V and 0.2 s above 230 V on TN final circuits.
Sizing
IS 3043:2026, Table 12, same material as the line conductor S: equal to S up to 16 mm², 16 mm² for S from 16 to 35 mm², S/2 above 35 mm². Or by the adiabatic equation S = √(I²t) / k.
Material
Insulated green-yellow copper cable, copper tape or copper-bonded conductor, with crimped lugs at both ends. No soldered joints and no switch in the PE.
Families

On your power plant site

Generator, transformer and motor frames get two separate and distinct earth connections. Copper conductors sized for the fault level are used for equipment earthing, galvanised or copper-bonded strip for structures and the switchyard mat, and flexible braids for rotating and vibrating machines.

  • Reg 43(vii)Frames of motors and control apparatus above 250 V are earthed by two separate and distinct connections.
  • Reg 50(2)Generator and transformer neutrals above 650 V are earthed by not less than two separate connections.
  • Reg 50(1)Substation earthing limits touch potential, step potential and earth potential rise.
  • Reg 50(8)Earth resistance is tested on a dry day at least once a year and the record is kept.

Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.

Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.

Want this checked against your plant?Send the single line diagram and layout. An LPES engineer reviews earthing, PE conductors and lightning protection against CEA 2023 and IS 3043:2026.
Call 080 4388 8915WhatsApp
Design values

LPS class, SPD rating and conductor sizes for power plant projects

The figures engineers look up most, with the clause behind each. Rows marked in red are specific to power plant sites.

ItemValueSource
Structures above 60 mProtect the top 20 % of the height against side flashesIEC 62305-3:2024, 5.2.3
Substation earth gridDesigned on touch and step voltage, not on a resistance figureIS 3043:2026, cl. 10 · IEEE 80
Steel frame or rebar as down conductorOverall continuity 0.2 Ω or less, measured four-wire at about 10 AIEC 62305-3:2024, D.5.3.5
Earth-enhancing compoundOnly above 3000 Ω·m and only for the lightning earthIS 3043:2026, 8.1.7
Rolling sphere radius20 / 30 / 45 / 60 m for LPS Class I / II / III / IVIEC 62305-3:2024, Table 2
Air-termination mesh5 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 2
Down-conductor spacing10 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 5
LPS conductor, minimum50 mm² in copper, aluminium, galvanised or stainless steelIEC 62305-3:2024, Table 7
Lightning earthRing electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 ΩIEC 62305-3:2024, 5.4
Entrance SPD where an LPS existsType 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IVIEC 62305-4:2024, Table C.3
SPD connecting leads0.5 m total or less, line to SPD to earth barIEC 62305-4:2024, Annex C
Second SPDNeeded when equipment is more than 10 m from the entrance SPDIEC 62305-4:2024, Annex C
Bonding bar to earth16 mm² copper, 25 mm² aluminium or 50 mm² steelIEC 62305-3:2024, Table 9
Disconnection time, TN final circuits0.4 s at 230 V, 0.2 s above 230 VIS 3043:2026, Table 1
Loop impedance, measuredZs ≤ ⅔ × U0 / IaIS 3043:2026 and IS 732
PE and bonding continuityWithin the conductor’s own resistance, tested at about 10 AIS 3043:2026, Annex E

The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.

Component standards

Every part of the power plant protection system has its own test standard

IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.

ComponentWhat the standard provesStandard
Clamps, connectors and bonding partsEach joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA.IEC 62561-1
Conductors and earth electrodesSets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper.IEC 62561-2
Isolating spark gapsJoins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike.IEC 62561-3
Conductor holders and fixingsHolders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures.IEC 62561-4
Earth pit housings and electrode sealsInspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab.IEC 62561-5
Lightning strike countersThe counter records each strike carried by a down conductor. A new count is the trigger for an inspection.IEC 62561-6
Earth enhancing compoundsThe compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it.IEC 62561-7
Surge protective devicesPart 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants.IEC 61643-11, IEC 61643-21, IEC 61643-31
PE, bonding and earthing conductorsSets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame.IEC 60364-5-54, IS 3043:2026, IS 732:2019

LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.

Need the bill of material for your power plant project?Share the drawings and LPES returns a specified, priced list across lightning protection, earthing and surge protection.
Call 080 4388 8915WhatsApp
From the LPES range

What goes into your power plant project

Each card opens the product family in the LPES catalogue.

LPES Earthing strips, tapes and cables
Earthing strips, tapes and cablesPE, bonding and earthing conductors in copper, copper-bonded and galvanised steelView family ›
LPES Copper-bonded round conductor
Copper-bonded round conductorCoils for down conductors, ring earths and bonding runsView family ›
LPES Galvanised flat conductor
Galvanised flat conductorHot-dip galvanised strip for grids and structure bondingView family ›
LPES Bridging braids and flexible links
Bridging braids and flexible linksBonds across joints, doors, trays and moving partsView family ›
LPES Earth bars and terminals
Earth bars and terminalsMain earthing terminals and local bonding barsView family ›
LPES Clamps and connectors
Clamps and connectorsJoints for round and flat conductors, built and comply to IEC 62561-1View family ›
LPES Conductor holders
Conductor holdersRoof, wall and structure fixings for LPS conductorsView family ›
LPES Earth electrodes, pits and backfill
Earth electrodes, pits and backfillRods, enhancement compound, pit chambers and test platesView family ›
LPES Surge protective devices
Surge protective devicesType 1+2, Type 2 and Type 3 for AC, DC, PV and signal linesView family ›
Scope

Areas LPES covers in power industry

  • Boilers, turbine halls and generators
  • Chimneys and cooling towers
  • Coal and ash handling plants
  • Switchyards and generator transformers
  • DCS, protection and control rooms
  • Water treatment and cooling water
  • Fuel oil and hydrogen systems
  • Hydro, gas and captive power plants
Two-minute check

Is your power plant site ready for an inspection?

Six points an Electrical Inspector or an insurer will ask about.

  1. Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
  2. Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
  3. Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
  4. Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
  5. The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
  6. SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Your result
0 of 6 in place

Answer the six points for your site. Nothing is sent anywhere until you ask.

By role

What each person on a power plant project asks

Plant electrical headWhen did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?

LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.

Testing & Measurement
How we work

Lightning to Load

Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.

Calculated. Coordinated. Implemented. Verified.

  1. AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
  2. DesignLPS, earthing and SPD design with calculations and drawings
  3. SpecifyBill of materials with LPES part numbers and data sheets
  4. SupplyProducts from one source, tested to IEC 62561 and IEC 61643
  5. ImplementInstallation supervision or turnkey execution
  6. VerifyContinuity, earth resistance and SPD checks, recorded
  7. AssurePeriodic inspection, monitoring and AMC

LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.

LPES services
Standards

Built and comply to

  • CEA Safety Regulations 2023
  • IEC 62305-1 to -4
  • IEC 62561 series
  • IEC 61643-11 and -21
  • IEC 61936-1
  • IEEE 80
  • IEC 60364-5-54
  • IS 3043:2026
  • CEA Safety Regulations 2023

The applicable edition and any project or statutory specification are confirmed at the design stage.

Questions engineers ask

Power Industry lightning protection and earthing: frequently asked questions

Is the chimney protected just by its own height?
No. The chimney is the most likely point of strike on the site, so it needs air termination, down conductors bonded to the reinforcement and a tested earth. Above 60 m the side of the chimney is also exposed and has to be protected.
Related: Air Termination ›
How is a switchyard earth mat designed?
On the touch, step and transferred voltages that people can be exposed to during the worst fault, using the fault current, clearing time and measured soil resistivity. A single resistance figure does not show whether a person at the fence or a breaker is safe.
Related: Earth Mats & Grids ›
Why does the DCS need surge protection if it is on UPS?
A UPS deals with supply interruptions. Surges reach DCS cards through field loops, communication links and the control supply itself. Signal and data SPDs at the marshalling cabinets stop them before they cause a false trip.
Related: Data, Signal & RF Line SPDs ›
Should electronics have a separate clean earth?
Electronic, station and lightning earths can be identified separately on drawings, but they are joined into one interconnected system. Separate unconnected earths create potential differences that damage equipment during a fault or a strike.
Related: Earth Bars & Terminals ›

Engineering guides from the LPES knowledge hub

  • Earthing of installations with higher protective conductor currentHB-ID-536
  • Supplementary bonding and installations with increased shock riskHB-ID-533
  • Types of protective earthing conductors and their electrical continuityHB-ID-530
  • Earthing conductor and protective bonding conductor sizingHB-ID-528
  • Main earthing terminal / main earth busbar (MET)HB-ID-529
  • Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
  • Measurement of earth fault loop impedance
  • Continuity resistance measurement

Related industries

More in Energy & Power

Still deciding where to start?Most power plant sites start with a risk assessment and an earthing audit. Talk to an LPES engineer today.
Call 080 4388 8915WhatsApp

Your power is connected. Is your protection?

Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.

Talk to LPES about a coordinated assessment for your power plant project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.

WhatsAppMessage LPES
OfficesBudapest, Hungary, Europe · Gurugram, India
Takes 20 seconds

Get a call back from an LPES engineer

Name and number. That is all. No drawings, GST details or part numbers needed now.

Add details, optional

An LPES engineer calls you within one working day. Your details go to LPES only. Prefer to talk now? 080 4388 8915

Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.