Lightning, earthing and surge protection for telecom towers and network sites
A cell site is built to be struck. The tower is the tallest point around, its radios and feeders run straight down into outdoor cabinets, and the site runs unattended on mains, batteries and DG. LPES earths the tower and shelter as one system, bonds feeders and cable trays, protects RRUs, rectifiers and transmission against surges, and carries the same discipline into network rooms and the NOC.

Network Equipment
Lattice tower and air termination
- Threat
- The tower top, antennas and aviation lamp at the highest point of the site.
- LPES measure
- Air terminal on the tower top extending above antennas and lamps, the tower used as down conductor and every leg bonded to the ring electrode.
- Families
Lightning, earthing and surge risks on network site sites
The tallest point around
Towers and rooftop poles stand above everything near them. They take direct strikes as a matter of routine, many times over their life.
Radios at the top of the tower
Remote radio units, antennas and their DC and fibre cables sit right where the strike lands. DC power lines run down the tower to the cabinets.
Remote, unattended sites
Most sites have no staff. A failed rectifier, SPD or radio takes the site off air until a team can reach it.
Soil and space limits
Rooftop and urban sites have no room for a large electrode system, and rural sites often stand on rock. The earthing has to be designed for the site, not copied.
One coordinated lightning protection, earthing and surge protection system
Four pillars. Connected protection. Clear accountability.
Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

Lightning protection
The tower is the air termination and the down conductor. LPES makes sure antennas, radios and lamps sit inside its protected zone, that the path to earth is continuous, and that rooftop poles bond to the building LPS.

Power protection
Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

Earthing protection
Tower ring, cabinet earth bar, cable trays, fence and DG are bonded into one site earthing system designed for the soil and space of each site. Network rooms get a mesh bonding network tied to the building earth.

Surge protection
Protection covers both power systems and every cable on the tower. Type 1+2 at the AC entry, DC SPDs at the rectifier output and at the RRUs, and coaxial and data SPDs on transmission and alarm lines.
Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.
Earthing and PE conductors: what protects people, and what CEA 2023 requires
An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.
On your network site site
Rectifier, cabinet cooling and DG frames above 250 V get two separate earth connections. The DC positive pole is earthed at one point to the site earth bar, and every bond is short and direct to keep impedance low.
- Reg 43(v)Every building has protective equipotential bonding that interconnects exposed and extraneous conductive parts.
- Reg 43(ix)Bonding conductors carry the prospective earth-fault current and are tested for effective bonding before energisation.
- Reg 43(xi), (xii)Earth-fault loop impedance is tested so the protective device disconnects in time.
- Reg 43(xiii)The neutral point of every generator and transformer is earthed by not less than two separate connections.
Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.
Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.
LPS class, SPD rating and conductor sizes for network site projects
The figures engineers look up most, with the clause behind each. Rows marked in red are specific to network site sites.
| Item | Value | Source |
|---|---|---|
| Telecom tower earthing | Ring electrode around the tower base bonded to every leg, and the shelter earth bar bonded to the ring | ITU-T K.56 · IEC 62305-3:2024 |
| Feeder and coaxial cables | Screens bonded at the antenna, at the tower base and at the building entry | ITU-T K.56 |
| −48 V DC power plant | Positive pole earthed at one point to the main earth bar, DC SPDs at the rectifier and remote radios | ETSI EN 300 132-2 · ITU-T K.27 |
| Earth-enhancing compound | Only above 3000 Ω·m and only for the lightning earth | IS 3043:2026, 8.1.7 |
| Rolling sphere radius | 20 / 30 / 45 / 60 m for LPS Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Air-termination mesh | 5 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 2 |
| Down-conductor spacing | 10 / 10 / 15 / 20 m for Class I / II / III / IV | IEC 62305-3:2024, Table 5 |
| LPS conductor, minimum | 50 mm² in copper, aluminium, galvanised or stainless steel | IEC 62305-3:2024, Table 7 |
| Lightning earth | Ring electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 Ω | IEC 62305-3:2024, 5.4 |
| Entrance SPD where an LPS exists | Type 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IV | IEC 62305-4:2024, Table C.3 |
| SPD connecting leads | 0.5 m total or less, line to SPD to earth bar | IEC 62305-4:2024, Annex C |
| Second SPD | Needed when equipment is more than 10 m from the entrance SPD | IEC 62305-4:2024, Annex C |
| Bonding bar to earth | 16 mm² copper, 25 mm² aluminium or 50 mm² steel | IEC 62305-3:2024, Table 9 |
| Disconnection time, TN final circuits | 0.4 s at 230 V, 0.2 s above 230 V | IS 3043:2026, Table 1 |
| Loop impedance, measured | Zs ≤ ⅔ × U0 / Ia | IS 3043:2026 and IS 732 |
| PE and bonding continuity | Within the conductor’s own resistance, tested at about 10 A | IS 3043:2026, Annex E |
The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.
Every part of the network site protection system has its own test standard
IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.
| Component | What the standard proves | Standard |
|---|---|---|
| Clamps, connectors and bonding parts | Each joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA. | IEC 62561-1 |
| Conductors and earth electrodes | Sets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper. | IEC 62561-2 |
| Isolating spark gaps | Joins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike. | IEC 62561-3 |
| Conductor holders and fixings | Holders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures. | IEC 62561-4 |
| Earth pit housings and electrode seals | Inspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab. | IEC 62561-5 |
| Lightning strike counters | The counter records each strike carried by a down conductor. A new count is the trigger for an inspection. | IEC 62561-6 |
| Earth enhancing compounds | The compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it. | IEC 62561-7 |
| Surge protective devices | Part 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants. | IEC 61643-11, IEC 61643-21, IEC 61643-31 |
| PE, bonding and earthing conductors | Sets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame. | IEC 60364-5-54, IS 3043:2026, IS 732:2019 |
LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.
What goes into your network site project
Each card opens the product family in the LPES catalogue.









Areas LPES covers in network equipment
- Greenfield telecom towers
- Rooftop sites and poles
- Small cells and street poles
- DC power plants and batteries
- Microwave and transmission links
- Enterprise network rooms
- Network operations centres
- Fibre huts and exchanges
Is your network site site ready for an inspection?
Six points an Electrical Inspector or an insurer will ask about.
- Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
- Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
- Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
- Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
- The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
- SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Answer the six points for your site. Nothing is sent anywhere until you ask.
What each person on a network site project asks
When did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?
LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.
Testing & MeasurementLightning to Load
Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.
Calculated. Coordinated. Implemented. Verified.
- AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
- DesignLPS, earthing and SPD design with calculations and drawings
- SpecifyBill of materials with LPES part numbers and data sheets
- SupplyProducts from one source, tested to IEC 62561 and IEC 61643
- ImplementInstallation supervision or turnkey execution
- VerifyContinuity, earth resistance and SPD checks, recorded
- AssurePeriodic inspection, monitoring and AMC
LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.
LPES servicesBuilt and comply to
- CEA Safety Regulations 2023
- IEC 62305-1 to -4
- ITU-T K.56
- ITU-T K.27
- IEC 61643-11, -21 and -41
- IEC 62561 series
- ETSI EN 300 132-2
- IS 3043:2026
- CEA Safety Regulations 2023
The applicable edition and any project or statutory specification are confirmed at the design stage.
Network Equipment lightning protection and earthing: frequently asked questions
What earth resistance does a telecom tower need?
Related: Earth Rods ›
Do RRUs at the top of the tower need SPDs?
Related: Low-voltage DC SPDs (24–220 V) ›
How are feeder and fibre cables bonded?
Related: Bonding Clamps & Leads ›
How do you earth a rooftop site?
Related: Air Terminal Rods ›
Engineering guides from the LPES knowledge hub
- Earthing of installations with higher protective conductor currentHB-ID-536
- Supplementary bonding and installations with increased shock riskHB-ID-533
- Types of protective earthing conductors and their electrical continuityHB-ID-530
- Earthing conductor and protective bonding conductor sizingHB-ID-528
- Main earthing terminal / main earth busbar (MET)HB-ID-529
- Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
- Measurement of earth fault loop impedance
- Continuity resistance measurement
Related industries
- Data CentresIndustry page
- Telecom OEMIndustry page
- Storage Service ProviderIndustry page
- Renewable EnergyIndustry page
More in Digital & Telecom Infrastructure
- Digital & Telecom InfrastructureSector overview
- Storage Service ProviderIndustry page
- Telecom OEMIndustry page
- Data CentresIndustry page
- All industriesIndustries overview
Your power is connected. Is your protection?
Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.
Talk to LPES about a coordinated assessment for your network site project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.