LPES International
LPES International
Protection to Perfection
Currency
0
0
Industries Network Equipment

Lightning, earthing and surge protection for telecom towers and network sites

A cell site is built to be struck. The tower is the tallest point around, its radios and feeders run straight down into outdoor cabinets, and the site runs unattended on mains, batteries and DG. LPES earths the tower and shelter as one system, bonds feeders and cable trays, protects RRUs, rectifiers and transmission against surges, and carries the same discipline into network rooms and the NOC.

Request a coordinated assessment
−48 V DC · 230 V ACrectifiers, batteries and remote radios on the DC side, mains and DG on the AC side, both protected and tied to one earth
Unattended sitesthousands of remote sites where every surge failure means a site visit and lost traffic
1 Passportdrawings, test records and inspection plan in a single LPES Protection Passport
The riskA telecom tower is built to be struck, and its radios and DC cables sit where the strike lands.
The LPES answerLPES earths tower and shelter as one system, bonds feeders and trays, and protects RRUs, rectifiers and transmission with AC, DC and data SPDs.
The ruleThe same bonding discipline carries into network rooms and the NOC.
Wireless network sites with lattice telecom towers carrying antennas and radio units, technicians on the tower, outdoor equipment cabinets, battery and power cabinets, DG set, cable trays, and a network operations centre with video wall and equipment racks, marked with LPES protection points
LPES protection map
Network Equipment
Lightning protectionEarthing & bondingSurge protectionSelect a point to see the threat, the LPES measure and the product families.
1Lightning protection

Lattice tower and air termination

Threat
The tower top, antennas and aviation lamp at the highest point of the site.
LPES measure
Air terminal on the tower top extending above antennas and lamps, the tower used as down conductor and every leg bonded to the ring electrode.
Families
The problem

Lightning, earthing and surge risks on network site sites

The tallest point around

Towers and rooftop poles stand above everything near them. They take direct strikes as a matter of routine, many times over their life.

Radios at the top of the tower

Remote radio units, antennas and their DC and fibre cables sit right where the strike lands. DC power lines run down the tower to the cabinets.

Remote, unattended sites

Most sites have no staff. A failed rectifier, SPD or radio takes the site off air until a team can reach it.

Soil and space limits

Rooftop and urban sites have no room for a large electrode system, and rural sites often stand on rock. The earthing has to be designed for the site, not copied.

The LPES answer

One coordinated lightning protection, earthing and surge protection system

Four pillars. Connected protection. Clear accountability.

Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

LPES L shield

Lightning protection

The tower is the air termination and the down conductor. LPES makes sure antennas, radios and lamps sit inside its protected zone, that the path to earth is continuous, and that rooftop poles bond to the building LPS.

LPES P shield

Power protection

Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

LPES E shield

Earthing protection

Tower ring, cabinet earth bar, cable trays, fence and DG are bonded into one site earthing system designed for the soil and space of each site. Network rooms get a mesh bonding network tied to the building earth.

LPES S shield

Surge protection

Protection covers both power systems and every cable on the tower. Type 1+2 at the AC entry, DC SPDs at the rectifier output and at the RRUs, and coaxial and data SPDs on transmission and alarm lines.

Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.

Protective conductors

Earthing and PE conductors: what protects people, and what CEA 2023 requires

An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.

Transformersource neutralMain earthing terminalEquipment framemotor, panel, skidSteel, pipes, traysEarth grid and electrodes12345Drag to rotate
Auto tour · select any point to stop
Conductor 3 of 5

Protective earthing (PE) conductor

Main earthing terminal to the frame of every piece of equipment

At a telecom or network site. Cabinet cooling and DG run unattended. A loose or undersized PE leaves the frame live after a fault.

Rule
CEA Reg 43(vii): two separate and distinct connections for apparatus above 250 V. Reg 43(ix): carries the prospective earth-fault current.
Limit
Earth-fault loop impedance: measured Zs ≤ ⅔ × U0 / Ia, so the device disconnects in 0.4 s at 230 V and 0.2 s above 230 V on TN final circuits.
Sizing
IS 3043:2026, Table 12, same material as the line conductor S: equal to S up to 16 mm², 16 mm² for S from 16 to 35 mm², S/2 above 35 mm². Or by the adiabatic equation S = √(I²t) / k.
Material
Insulated green-yellow copper cable, copper tape or copper-bonded conductor, with crimped lugs at both ends. No soldered joints and no switch in the PE.
Families

On your network site site

Rectifier, cabinet cooling and DG frames above 250 V get two separate earth connections. The DC positive pole is earthed at one point to the site earth bar, and every bond is short and direct to keep impedance low.

  • Reg 43(v)Every building has protective equipotential bonding that interconnects exposed and extraneous conductive parts.
  • Reg 43(ix)Bonding conductors carry the prospective earth-fault current and are tested for effective bonding before energisation.
  • Reg 43(xi), (xii)Earth-fault loop impedance is tested so the protective device disconnects in time.
  • Reg 43(xiii)The neutral point of every generator and transformer is earthed by not less than two separate connections.

Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.

Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.

Want this checked against your plant?Send the single line diagram and layout. An LPES engineer reviews earthing, PE conductors and lightning protection against CEA 2023 and IS 3043:2026.
Call 080 4388 8915WhatsApp
Design values

LPS class, SPD rating and conductor sizes for network site projects

The figures engineers look up most, with the clause behind each. Rows marked in red are specific to network site sites.

ItemValueSource
Telecom tower earthingRing electrode around the tower base bonded to every leg, and the shelter earth bar bonded to the ringITU-T K.56 · IEC 62305-3:2024
Feeder and coaxial cablesScreens bonded at the antenna, at the tower base and at the building entryITU-T K.56
−48 V DC power plantPositive pole earthed at one point to the main earth bar, DC SPDs at the rectifier and remote radiosETSI EN 300 132-2 · ITU-T K.27
Earth-enhancing compoundOnly above 3000 Ω·m and only for the lightning earthIS 3043:2026, 8.1.7
Rolling sphere radius20 / 30 / 45 / 60 m for LPS Class I / II / III / IVIEC 62305-3:2024, Table 2
Air-termination mesh5 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 2
Down-conductor spacing10 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 5
LPS conductor, minimum50 mm² in copper, aluminium, galvanised or stainless steelIEC 62305-3:2024, Table 7
Lightning earthRing electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 ΩIEC 62305-3:2024, 5.4
Entrance SPD where an LPS existsType 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IVIEC 62305-4:2024, Table C.3
SPD connecting leads0.5 m total or less, line to SPD to earth barIEC 62305-4:2024, Annex C
Second SPDNeeded when equipment is more than 10 m from the entrance SPDIEC 62305-4:2024, Annex C
Bonding bar to earth16 mm² copper, 25 mm² aluminium or 50 mm² steelIEC 62305-3:2024, Table 9
Disconnection time, TN final circuits0.4 s at 230 V, 0.2 s above 230 VIS 3043:2026, Table 1
Loop impedance, measuredZs ≤ ⅔ × U0 / IaIS 3043:2026 and IS 732
PE and bonding continuityWithin the conductor’s own resistance, tested at about 10 AIS 3043:2026, Annex E

The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.

Component standards

Every part of the network site protection system has its own test standard

IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.

ComponentWhat the standard provesStandard
Clamps, connectors and bonding partsEach joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA.IEC 62561-1
Conductors and earth electrodesSets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper.IEC 62561-2
Isolating spark gapsJoins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike.IEC 62561-3
Conductor holders and fixingsHolders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures.IEC 62561-4
Earth pit housings and electrode sealsInspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab.IEC 62561-5
Lightning strike countersThe counter records each strike carried by a down conductor. A new count is the trigger for an inspection.IEC 62561-6
Earth enhancing compoundsThe compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it.IEC 62561-7
Surge protective devicesPart 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants.IEC 61643-11, IEC 61643-21, IEC 61643-31
PE, bonding and earthing conductorsSets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame.IEC 60364-5-54, IS 3043:2026, IS 732:2019

LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.

Need the bill of material for your network site project?Share the drawings and LPES returns a specified, priced list across lightning protection, earthing and surge protection.
Call 080 4388 8915WhatsApp
From the LPES range

What goes into your network site project

Each card opens the product family in the LPES catalogue.

LPES Earthing strips, tapes and cables
Earthing strips, tapes and cablesPE, bonding and earthing conductors in copper, copper-bonded and galvanised steelView family ›
LPES Copper-bonded round conductor
Copper-bonded round conductorCoils for down conductors, ring earths and bonding runsView family ›
LPES Galvanised flat conductor
Galvanised flat conductorHot-dip galvanised strip for grids and structure bondingView family ›
LPES Bridging braids and flexible links
Bridging braids and flexible linksBonds across joints, doors, trays and moving partsView family ›
LPES Earth bars and terminals
Earth bars and terminalsMain earthing terminals and local bonding barsView family ›
LPES Clamps and connectors
Clamps and connectorsJoints for round and flat conductors, built and comply to IEC 62561-1View family ›
LPES Conductor holders
Conductor holdersRoof, wall and structure fixings for LPS conductorsView family ›
LPES Earth electrodes, pits and backfill
Earth electrodes, pits and backfillRods, enhancement compound, pit chambers and test platesView family ›
LPES Surge protective devices
Surge protective devicesType 1+2, Type 2 and Type 3 for AC, DC, PV and signal linesView family ›
Scope

Areas LPES covers in network equipment

  • Greenfield telecom towers
  • Rooftop sites and poles
  • Small cells and street poles
  • DC power plants and batteries
  • Microwave and transmission links
  • Enterprise network rooms
  • Network operations centres
  • Fibre huts and exchanges
Two-minute check

Is your network site site ready for an inspection?

Six points an Electrical Inspector or an insurer will ask about.

  1. Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
  2. Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
  3. Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
  4. Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
  5. The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
  6. SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Your result
0 of 6 in place

Answer the six points for your site. Nothing is sent anywhere until you ask.

By role

What each person on a network site project asks

Plant electrical headWhen did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?

LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.

Testing & Measurement
How we work

Lightning to Load

Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.

Calculated. Coordinated. Implemented. Verified.

  1. AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
  2. DesignLPS, earthing and SPD design with calculations and drawings
  3. SpecifyBill of materials with LPES part numbers and data sheets
  4. SupplyProducts from one source, tested to IEC 62561 and IEC 61643
  5. ImplementInstallation supervision or turnkey execution
  6. VerifyContinuity, earth resistance and SPD checks, recorded
  7. AssurePeriodic inspection, monitoring and AMC

LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.

LPES services
Standards

Built and comply to

  • CEA Safety Regulations 2023
  • IEC 62305-1 to -4
  • ITU-T K.56
  • ITU-T K.27
  • IEC 61643-11, -21 and -41
  • IEC 62561 series
  • ETSI EN 300 132-2
  • IS 3043:2026
  • CEA Safety Regulations 2023

The applicable edition and any project or statutory specification are confirmed at the design stage.

Questions engineers ask

Network Equipment lightning protection and earthing: frequently asked questions

What earth resistance does a telecom tower need?
A low value helps, but the arrangement matters more. A ring around the tower bonded to every leg, a single site earth bar and short bonds equalise potential during a strike, which protects equipment even where soil keeps the resistance high.
Related: Earth Rods ›
Do RRUs at the top of the tower need SPDs?
Yes. The DC cable from the base to the radios runs along the struck structure. DC SPDs at the radio end and at the cabinet end protect both the radios and the power plant.
Related: Low-voltage DC SPDs (24–220 V) ›
How are feeder and fibre cables bonded?
Metal screens and armour are bonded at the top of the tower, at the base and where they enter the shelter or cabinet, so lightning current leaves the cable before it reaches the equipment.
Related: Bonding Clamps & Leads ›
How do you earth a rooftop site?
By bonding to the building LPS and its down conductors instead of building a separate electrode, keeping the pole inside the protected zone and bonding the cabinet earth bar to the building main earthing terminal.
Related: Air Terminal Rods ›

Engineering guides from the LPES knowledge hub

  • Earthing of installations with higher protective conductor currentHB-ID-536
  • Supplementary bonding and installations with increased shock riskHB-ID-533
  • Types of protective earthing conductors and their electrical continuityHB-ID-530
  • Earthing conductor and protective bonding conductor sizingHB-ID-528
  • Main earthing terminal / main earth busbar (MET)HB-ID-529
  • Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
  • Measurement of earth fault loop impedance
  • Continuity resistance measurement

Related industries

More in Digital & Telecom Infrastructure

Still deciding where to start?Most network site sites start with a risk assessment and an earthing audit. Talk to an LPES engineer today.
Call 080 4388 8915WhatsApp

Your power is connected. Is your protection?

Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.

Talk to LPES about a coordinated assessment for your network site project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.

WhatsAppMessage LPES
OfficesBudapest, Hungary, Europe · Gurugram, India
Takes 20 seconds

Get a call back from an LPES engineer

Name and number. That is all. No drawings, GST details or part numbers needed now.

Add details, optional

An LPES engineer calls you within one working day. Your details go to LPES only. Prefer to talk now? 080 4388 8915

Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.