LPES International
LPES International
Protection to Perfection
Currency
0
0
Industries Chemicals & Fertilisers

Lightning, earthing and surge protection for chemical and fertiliser plants

A chemical plant holds flammable, toxic and corrosive material inside a tightly controlled process. A static spark in a classified area, a strike to a column or a surge on one instrument loop can each stop the unit. LPES protects structures, earthing, static bonding and automation as one coordinated and documented system.

Request a coordinated assessment
Zone 1 / 2 · 21 / 22solvent and powder areas get verified static earthing and bonding
4–20 mA · HART · Fieldbusloops to the DCS and the safety system are protected alongside power, with SPDs suited to the Ex concept of each loop
1 Passportdrawings, test records and inspection plan in a single LPES Protection Passport
The riskIn a chemical plant a static spark is an ignition source, a strike to a column travels through the piping and a surge on one loop can end a batch.
The LPES answerLPES combines tower and column protection, one corrosion-resistant earthing network with monitored static bonding, and SPDs on power and signal lines.
The ruleEvery component in a classified area is selected against the hazardous area classification drawing, and every reading is recorded.
Chemical process plant with reactor structure, distillation columns, storage tanks, pipe racks, pumps, cooling towers and stack, marked with LPES protection points
LPES protection map
Chemicals & Fertilisers
Lightning protectionEarthing & bondingSurge protectionSelect a point to see the threat, the LPES measure and the product families.
1Lightning protection

Distillation columns and tall vessels

Threat
Direct strikes to columns, with lightning current flowing through platforms, piping and instrument tubing.
LPES measure
Column shells are used as natural air termination and down conductors where thickness and continuity are verified. Platforms, ladders and piping are bonded to the shell, and the base is tied to the ring electrode at two points.
Families
The problem

Lightning, earthing and surge risks on chemical plant sites

Ignition in classified areas

Solvent vapour and combustible dust need very little energy to ignite. Static builds up during charging, transfer, drying and bagging, and a nearby strike can spark across any unbonded gap.

Tall, exposed process steel

Distillation columns, prilling towers, stacks and flares stand above the rest of the plant and take the strikes. Everything attached to them carries part of that current.

A trip in the middle of a batch

A surge that takes out an I/O card or a drive can stop agitation or cooling during an exothermic step. The safety system brings the unit to a safe state, and the batch is usually lost.

Earthing that corrodes unseen

Acids, caustic and fertiliser dust attack buried conductors and joints. An earthing system that tested well at commissioning can be open-circuit a few years later.

The LPES answer

One coordinated lightning protection, earthing and surge protection system

Four pillars. Connected protection. Clear accountability.

Lightning protection, earthing and surge protection only work when they are designed together. LPES is the four parts of that system in one name.

LPES L shield

Lightning protection

Columns, towers, stacks, tank farms and process buildings are assessed together under one risk assessment. Process steel is used as a natural component where thickness and continuity are proven, and classified areas are kept clear of sparking parts.

LPES P shield

Power protection

Protection only works if the power system lets it. LPES studies the fault levels, neutral earthing, earth-fault loop impedance and protection settings, so that every PE conductor is sized for its fault current and every protective device disconnects in time.

LPES E shield

Earthing protection

One interconnected earthing network serves power, instruments, static and lightning. Materials and joints are chosen for the corrosion conditions of the plant, and static earthing in classified areas is monitored so every transfer has a recorded, proven earth.

LPES S shield

Surge protection

Protection follows the automation hierarchy. Type 1+2 at the incomer, Type 2 at MCC, VFD and UPS panels, Type 3 and signal SPDs at DCS, safety system and fire and gas cabinets and at exposed field instruments. Remote status contacts show a spent module in the control room.

Products are available in four series, LPES BASIC, LPES SMART, LPES PRO and LPES CENTURY, so the specification can match the duty and the budget of each area of the site.

Protective conductors

Earthing and PE conductors: what protects people, and what CEA 2023 requires

An electrode in the ground protects nobody on its own. People and equipment are protected by the conductors that join every frame, panel and pipe back to the main earthing terminal. The CEA Safety Regulations 2023 make these connections mandatory. Select a conductor to see the rule, the sizing and the LPES material. The LPES shields mark where lightning, power, earthing and surge protection apply on the plant, down to the SPD type at each level.

Transformersource neutralMain earthing terminalEquipment framemotor, panel, skidSteel, pipes, traysEarth grid and electrodes12345Drag to rotate
Auto tour · select any point to stop
Conductor 3 of 5

Protective earthing (PE) conductor

Main earthing terminal to the frame of every piece of equipment

On a chemical plant. Agitator, pump and compressor motors run in classified areas. A loose PE leaves a frame live where a spark cannot be allowed.

Rule
CEA Reg 43(vii): two separate and distinct connections for apparatus above 250 V. Reg 43(ix): carries the prospective earth-fault current.
Limit
Earth-fault loop impedance: measured Zs ≤ ⅔ × U0 / Ia, so the device disconnects in 0.4 s at 230 V and 0.2 s above 230 V on TN final circuits.
Sizing
IS 3043:2026, Table 12, same material as the line conductor S: equal to S up to 16 mm², 16 mm² for S from 16 to 35 mm², S/2 above 35 mm². Or by the adiabatic equation S = √(I²t) / k.
Material
Insulated green-yellow copper cable, copper tape or copper-bonded conductor, with crimped lugs at both ends. No soldered joints and no switch in the PE.
Families

On your chemical plant site

Every motor, MCC, junction box and skid above 250 V gets two separate and distinct earth connections back to the grid. A PE conductor runs with each power cable. Insulated copper is used for instrument and control earths, and copper-bonded or tinned conductors for structure and equipment bonding where the atmosphere is corrosive.

  • Reg 43(vii)Frames of motors, transformers and control apparatus above 250 V are earthed by two separate and distinct connections.
  • Reg 38(3)(vi)Lightning protection as per relevant standards for installations with explosive or flammable material.
  • Reg 50(1)Substation earthing limits touch potential, step potential and transferred potential.
  • Reg 50(8)Earth resistance is tested on a dry day at least once a year and the record is kept.

Two points from IS 3043:2026 that change how earthing is specified. At low voltage there is no minimum earth electrode resistance: protection depends on the earth-fault loop impedance and on the protective device tripping in time. And separate “dedicated” or “clean” earth pits for neutral, body, instruments or electronics are not to be used: every electrode joins one interconnected earthing network.

Clause references are to the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023. Sizing lines follow IS 3043:2026 and IS 732:2019. Confirm against the current official text and state notifications before using them in a tender or inspection.

Want this checked against your plant?Send the single line diagram and layout. An LPES engineer reviews earthing, PE conductors and lightning protection against CEA 2023 and IS 3043:2026.
Call 080 4388 8915WhatsApp
Design values

LPS class, SPD rating and conductor sizes for chemical plant projects

The figures engineers look up most, with the clause behind each. Rows marked in red are specific to chemical plant sites.

ItemValueSource
Structures above 60 mProtect the top 20 % of the height against side flashesIEC 62305-3:2024, 5.2.3
Supplementary bonding in Ex areasAt least 10 mm² copper, never through the neutralIS 3043:2026, 11.4
Panel PE terminal to any exposed part0.1 Ω or less, tested at 10 A or moreIS 3043:2026, 7.1
Separate “instrument” earth pitsNot permitted. One interconnected earthing networkIS 3043:2026, 6.3
Rolling sphere radius20 / 30 / 45 / 60 m for LPS Class I / II / III / IVIEC 62305-3:2024, Table 2
Air-termination mesh5 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 2
Down-conductor spacing10 / 10 / 15 / 20 m for Class I / II / III / IVIEC 62305-3:2024, Table 5
LPS conductor, minimum50 mm² in copper, aluminium, galvanised or stainless steelIEC 62305-3:2024, Table 7
Lightning earthRing electrode at least 0.5 m deep, about 1 m from the walls. Aim below 10 ΩIEC 62305-3:2024, 5.4
Entrance SPD where an LPS existsType 1 (Class I). Iimp 25 / 18.75 / 12.5 kA per pole for LPL I / II / III–IVIEC 62305-4:2024, Table C.3
SPD connecting leads0.5 m total or less, line to SPD to earth barIEC 62305-4:2024, Annex C
Second SPDNeeded when equipment is more than 10 m from the entrance SPDIEC 62305-4:2024, Annex C
Bonding bar to earth16 mm² copper, 25 mm² aluminium or 50 mm² steelIEC 62305-3:2024, Table 9
Disconnection time, TN final circuits0.4 s at 230 V, 0.2 s above 230 VIS 3043:2026, Table 1
Loop impedance, measuredZs ≤ ⅔ × U0 / IaIS 3043:2026 and IS 732
PE and bonding continuityWithin the conductor’s own resistance, tested at about 10 AIS 3043:2026, Annex E

The LPS class and the SPD protection level are set by an IEC 62305-2 risk assessment for the site, not chosen from this table. Values are quoted for reference and must be confirmed against the current edition of each standard at design stage.

Component standards

Every part of the chemical plant protection system has its own test standard

IEC 62305 sets the design. The IEC 62561 series sets the test for each component that carries lightning current. A system holds only if the clamp, the conductor and the electrode each pass their own test.

ComponentWhat the standard provesStandard
Clamps, connectors and bonding partsEach joint is aged in salt mist and a humid sulphurous atmosphere, then tested with lightning current. Class H is tested at 100 kA and class N at 50 kA.IEC 62561-1
Conductors and earth electrodesSets the material, cross-section and coating of tapes, round conductors and rods. A copper-bonded steel rod carries at least 250 µm of 99.9 % copper.IEC 62561-2
Isolating spark gapsJoins metal parts that must stay separate in service, such as insulating flanges and cathodically protected pipes. The gap conducts only during a strike.IEC 62561-3
Conductor holders and fixingsHolders are tested for mechanical strength after environmental ageing, so the conductor stays in place on roofs, walls and structures.IEC 62561-4
Earth pit housings and electrode sealsInspection housings are load tested. Seals are tested where an electrode passes through a waterproofed slab.IEC 62561-5
Lightning strike countersThe counter records each strike carried by a down conductor. A new count is the trigger for an inspection.IEC 62561-6
Earth enhancing compoundsThe compound is tested for leaching, sulphur content, resistivity and corrosion of the electrode buried in it.IEC 62561-7
Surge protective devicesPart 11 covers SPDs on AC power, part 21 covers signal and data lines, and part 31 covers the DC side of PV plants.IEC 61643-11, IEC 61643-21, IEC 61643-31
PE, bonding and earthing conductorsSets the size, material, joints and continuity of every protective conductor from the earth electrode to the equipment frame.IEC 60364-5-54, IS 3043:2026, IS 732:2019

LPES components are built and comply to the parts listed. Ask for the test report of the specific product with your enquiry. Confirm clause values against the current edition of each standard at design stage.

Need the bill of material for your chemical plant project?Share the drawings and LPES returns a specified, priced list across lightning protection, earthing and surge protection.
Call 080 4388 8915WhatsApp
From the LPES range

What goes into your chemical plant project

Each card opens the product family in the LPES catalogue.

LPES Earthing strips, tapes and cables
Earthing strips, tapes and cablesPE, bonding and earthing conductors in copper, copper-bonded and galvanised steelView family ›
LPES Copper-bonded round conductor
Copper-bonded round conductorCoils for down conductors, ring earths and bonding runsView family ›
LPES Galvanised flat conductor
Galvanised flat conductorHot-dip galvanised strip for grids and structure bondingView family ›
LPES Bridging braids and flexible links
Bridging braids and flexible linksBonds across joints, doors, trays and moving partsView family ›
LPES Earth bars and terminals
Earth bars and terminalsMain earthing terminals and local bonding barsView family ›
LPES Clamps and connectors
Clamps and connectorsJoints for round and flat conductors, built and comply to IEC 62561-1View family ›
LPES Conductor holders
Conductor holdersRoof, wall and structure fixings for LPS conductorsView family ›
LPES Earth electrodes, pits and backfill
Earth electrodes, pits and backfillRods, enhancement compound, pit chambers and test platesView family ›
LPES Surge protective devices
Surge protective devicesType 1+2, Type 2 and Type 3 for AC, DC, PV and signal linesView family ›
Scope

Areas LPES covers in chemicals & fertilisers

  • Batch and continuous reactor blocks
  • Distillation, absorption and prilling towers
  • Tank farms and tanker loading bays
  • Powder handling, drying and bagging
  • Boilers, cooling towers and utilities
  • Effluent treatment and scrubbers
  • Substations, MCC rooms, DG and UPS
  • DCS, safety system and fire and gas
Two-minute check

Is your chemical plant site ready for an inspection?

Six points an Electrical Inspector or an insurer will ask about.

  1. Every motor and panel above 250 V has two separate earth connections.Reg 43(vii)
  2. Protective equipotential bonding is installed and was tested before energisation.Reg 43(v), 43(ix)
  3. Earth-fault loop impedance has been tested for each circuit and each source.Reg 43(xi)
  4. Earth resistance is tested every year in the dry season and the record is kept.Reg 50(8)
  5. The lightning protection system has a current risk assessment and inspection record.Reg 38(3)(vi)
  6. SPDs are fitted at the incomers and their status is checked on rounds.IEC 62305-4
Your result
0 of 6 in place

Answer the six points for your site. Nothing is sent anywhere until you ask.

By role

What each person on a chemical plant project asks

Plant electrical headWhen did we last prove that every protective conductor is continuous and every breaker will trip on an earth fault?

LPES measures loop impedance and PE continuity circuit by circuit and hands over the record.

Testing & Measurement
How we work

Lightning to Load

Seven stages, from the first risk assessment to the yearly inspection, with clear ownership at every interface.

Calculated. Coordinated. Implemented. Verified.

  1. AssessIEC 62305-2 risk assessment, site audit, soil resistivity survey
  2. DesignLPS, earthing and SPD design with calculations and drawings
  3. SpecifyBill of materials with LPES part numbers and data sheets
  4. SupplyProducts from one source, tested to IEC 62561 and IEC 61643
  5. ImplementInstallation supervision or turnkey execution
  6. VerifyContinuity, earth resistance and SPD checks, recorded
  7. AssurePeriodic inspection, monitoring and AMC

LPES Protection Passport. Every project closes with one document set: risk assessment, as-built drawings, product list with part numbers, test records and the inspection plan.

LPES services
Standards

Built and comply to

  • CEA Safety Regulations 2023
  • IEC 62305-1 to -4
  • IEC 62561 series
  • IEC 61643-11 and -21
  • IEC 60364-5-53
  • IEC 60079-14
  • IEC TS 60079-32-1
  • IS 3043:2026
  • IS 732:2019

The applicable edition and any project or statutory specification are confirmed at the design stage.

Questions engineers ask

Chemicals & Fertilisers lightning protection and earthing: frequently asked questions

Do Ex-rated instruments still need surge protection?
Yes. Flameproof and intrinsically safe protection deals with ignition, not with surge withstand. Transmitters on long field loops are damaged by induced surges like any other instrument. The SPD has to suit the protection concept of the loop, and for intrinsically safe circuits it is assessed as part of that loop.
Related: Data, Signal & RF Line SPDs ›
How is static controlled during tanker unloading and powder charging?
By bonding every conductive part of the transfer path to earth and proving the connection before the transfer starts. Monitored static earthing systems check the clamp connection and give a permissive to the pump or valve.
Related: Static Earthing (Ex) ›
Which earthing materials last in a corrosive plant?
Copper-bonded steel rods, copper conductors and exothermic welded joints below ground, with tinned copper or stainless steel where acid or fertiliser dust is present. Bolted joints are kept above ground, where they can be inspected and tested.
Related: Exothermic Welding ›
Can instruments have their own separate earth?
No. A separate, unconnected instrument earth creates a potential difference inside a classified area during a fault or a strike. Instrument and electrical earths are parts of one interconnected system, joined at defined earth bars.
Related: Earth Bars & Terminals ›

Engineering guides from the LPES knowledge hub

  • Supplementary bonding and installations with increased shock riskHB-ID-533
  • Earthing of installations with higher protective conductor currentHB-ID-536
  • Types of protective earthing conductors and their electrical continuityHB-ID-530
  • Earthing conductor and protective bonding conductor sizingHB-ID-528
  • Main earthing terminal / main earth busbar (MET)HB-ID-529
  • Fault protection by automatic disconnection in TN, TT and IT systemsHB-ID-532
  • Measurement of earth fault loop impedance
  • Continuity resistance measurement

Related industries

More in Manufacturing & Process

Still deciding where to start?Most chemical plant sites start with a risk assessment and an earthing audit. Talk to an LPES engineer today.
Call 080 4388 8915WhatsApp

Your power is connected. Is your protection?

Bring your electrical protection together. Understand your risks. Coordinate your protection. Know who owns each responsibility.

Talk to LPES about a coordinated assessment for your chemical plant project, from Lightning to Load. You get: a risk assessment and a protection concept, based on your site layout and single line diagram.

WhatsAppMessage LPES
OfficesBudapest, Hungary, Europe · Gurugram, India
Takes 20 seconds

Get a call back from an LPES engineer

Name and number. That is all. No drawings, GST details or part numbers needed now.

Add details, optional

An LPES engineer calls you within one working day. Your details go to LPES only. Prefer to talk now? 080 4388 8915

Items have been added to cart.
One or more items could not be added to cart due to certain restrictions.
Added to cart
Quantity updated
- An error occurred. Please try again later.
Deleted from cart
- An error occurred. Please try again later.